初支面前回填注浆技巧交底(国外英文资料).doc

初支面前回填注浆技巧交底(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初支面前回填注浆技巧交底(国外英文资料)

初支背后回填注浆技术交底(国外英文资料) BJ01-71-2003 Technical background record (table C2-5). Serial number The name of the project Beijing metro line 4 huangzhuang - zhongguancun area project Names of parts of tunnel The name of the process Backfill grouting in the back Construction unit China iron and steel co., LTD Date of disclosure 2005.10.10 Content of the disclosure: Homework preparation 1.1 machines and tools preparation 1.1.1 machine tools: injection machine, slurry mixer, air compressor, mixing barrel. 1.2 material preparation Cement, sodium silicate, Ф 32 x3. 25 mm hot rolled steel pipe. 1.3 operation conditions Before the injection, the injection pipe should be cleaned up and cleaned up. The pressure gauge of 1.3.2 injection machine is good, and the high-pressure pipe is unimpeded. 1.3.3 has been fully inspected and tested for mechanical equipment, geomantic piping, cable line etc. The operating area has good ventilation and adequate lighting. The grouting in the back of 1.3.5 must be kept for 28 days. Technical measures of construction and the requirements of main practice 2.1 the process flow Termination of the grouting Perfusion slurry Preparation of Embedded grouting pipe Check the grouting equipment Construction operation points and requirements 2.2.1 the injection pipe 2.2.1.1 ductule USES Ф 32 x3. 25 mm hot rolled steel tube, length of 40 ㎝, when have overexcavation lengthened appropriately, grouting tube into the water It should be with the surrounding rocks. 2.2.1.2 grouting tube is buried in the arch in front of the steel grating, with 3 roots, and the ring spacing 2m, and the vertical spacing is 5m, and the grating welds are strong. 2.2.2 sizing 2.2.2.1 grouting is made of single liquid water slurry, single liquid water slurry is made of ordinary Portland cement, foreign dopant (water glass) and water. 2.2.2.2 mix ratio: 1, 3 ~ 5% of water glass is added to 1. 2.2.3 perfusion liquid nuke underhand Bottom man This form is filled in by the bottom unit, and the u

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档