- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
修建施工谜底(国外英文资料)
建筑施工答案(国外英文资料)
Note: the following is the teacher organize the title of the reference answer, the teacher said that I hope the students dont make mistakes, propaganda, or exam will be temporary in the paper.
Teacher for only a part of the subject, and the need to look up, the above indicate the number of pages is southeast of textbooks on the pages, the teacher said southeast of textbooks can ask level 10, 11 south xus engineering management and civil students to borrow.
But the following questions and the teachers calculation will be ok.
The teacher emphasized the need to pay attention to the discipline of examinations
One, single choice question
In the concrete frame structure of the concrete reinforced concrete frame, the connection of vertical bar is applied to welding.
A. flash welding c. welding c. electroslag pressure welding d. resistance welding
The level of brick and mortar is at least reached (above).
A. 90% b. 80% c. 75% d. 70%
Which of the following is not a column correction:
A. Vertical correction? Is the column deflected? The plane position axis
When the linoleum is lined with the roof of the roof, the short side connection is not less than 100mm and the long side is not less than ().
A. A 50 mm?? B. 60 mm?????? C. 70 mm?? D. 100 mm
The concrete strength of the precast pile shall reach the design strength grade ().
A. 50% b. 60% c. 70% d. 100%
No noise, no vibration, no disturbance to the surrounding environment, suitable for construction in cities.
A. the hammer sank the pile b. the pile of vibration was heavy
The waterproof concrete should be maintained naturally, and the maintenance time should not be less than ().
A. 7d? B. 10 d?? ????? C. 14 d? ? 21 D D.
When building a brick wall, it is not less than the height ().
A. 1/2 B. 1/3 c. 2/3 d. 1/4
The change after the rebar is ().
A. The yield point increases the B. Plasticity increases the c. elastic modulus improves the D. Lattice deformation stops
In prestressed concrete construction, no need fo
文档评论(0)