一钢轧厂临盆TC420L、T420L 汽车大梁用热轧钢带工艺操纵规程(国外英文资料).doc

一钢轧厂临盆TC420L、T420L 汽车大梁用热轧钢带工艺操纵规程(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
一钢轧厂临盆TC420L、T420L 汽车大梁用热轧钢带工艺操纵规程(国外英文资料)

一钢轧厂生产TC420L、T420L 汽车大梁用热轧钢带工艺操作规程(国外英文资料) A steel mill produces TC420L, T420L car girder with hot rolled steel belt Process instruction 2011L124 replaces 2010L144 This process is suitable for the production of TC420L, T420L, and girder of the T420L in a steel rolling factory. Number 1 and chemical composition The smelting is produced by the internal control plate, and its composition control is as follows: brand Chemical composition, % C Mn s. P Si Als N (PPM) NTC420L NTH420L NT420L 0.060 ~ 0.080 1.10 ~ 1.20 0.010 or less ? 0.020 0.10 or less 0.015 ~ 0.035 50 or less The target 0.070 1.15 0.008 or less ? 0.015 0.07 0.020 or higher 40 or less Residual elements in steel: Cu, Ni, Cr, less than 0.30% 2 converter operation Requirement of 2.1 raw materials Water conditions of 2.1.1 The entrance to the furnace is less than 0.015% and P is less than 0.120%. The temperature of 1300 ℃ or higher. 2.1.2 steel scrap Internal quality scrap steel. 2.2 end control The finish component: C is less than 0.06%, S is less than 0.020%, P is less than 0.012%. 2.3 deoxygenation 2.3.1 USES the medium carbon manganese iron with manganese, silicon iron with silicon. According to the end of the end, the oxygen is used to deoxidize the aluminium manganese titanium or aluminum iron, and the steel and steel water is added at a quarter of the time, and the alloy material is added before 2/3 of the steel. Added sequence: aluminium manganese titanium or alumina ferro-manganese ferro-silicon-aluminium manganese titanium or aluminum iron - lime or refined slag. The contents of the package are controlled by the lower part of the composition, the Als100 ~ 300ppm (reference value). 3 LF process 3.1 according to the S content in steel, joined the amount of lime and fluorite is determined, in the meantime, by the moderate intensity of argon stirring, and made white slag ladle to join, a suitable thickness of slag foaming, prevent the increase of nitrogen. After the composition is qualified, the calcium p

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档