- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中小河道治理项目完工验收判定书(标准样稿)(国外英文资料)
中小河流治理项目竣工验收鉴定书(标准样稿)(国外英文资料)
The provincial water conservancy and infrastructure investment is 10 million yuan, the district level will be matched by 10,000 yuan.
(4) the relevant units of the project construction
Project legal person: the project construction administration department
Design unit: the design institute
Supervisor: the ministry of supervision
Construction unit: x (Ⅰ standard)
Xx (Ⅱ standard)
Quality supervision: the quality supervision station of the water conservancy project in anqing
Safety supervision: the key water conservancy project administration in anqing
Running management: * * *
The construction process of the project
Main project construction and completion time.
The project is to be completed in the year of x (x). The project starts and the completion time of each division is shown in table 1.
Major design changes.
Engineering major design change to x, x x x x x x, compiled the project entity entrusts the original design units the x design change report, on x x x x x x, the citys water to report on x design change approval (water-based (no. 2014 x)) approval to change.
The major design changes are xx change to * *. The project legal person has handled the relevant change procedure. (all redesigning changes and major design changes are described in accordance with the approval documents)
Major technical issues and situation.
No.
Table 1 the completion schedule for each branch project
The serial number
Project name
The commencement date
Completion date
note
one
Ⅰ standard
2
3
4
5
6
7
8
9
10
Ⅱ standard
11
12
13
14
15
16
17
(6) the completion of the project and the main amount of work completed
The project actually completed the content: * * (the control of the project quantity of the project).
Complete the main project quantity as shown in table 2.
Table 2 the main engineering quantity comparison table is completed and completed
The serial number
The project name
unit
Approval of quantities
Complete the quantities
The percentage of the app
您可能关注的文档
- [创业]让武汉人吃上“宁神早餐”(国外英文资料).doc
- 《下落工程造价“三步法”》(国外英文资料).doc
- 《主动变速器》-温习题&谜底(朱明zhubob)(国外英文资料).doc
- 《依据偏向和距离肯定位置》导学案(国外英文资料).doc
- 《修建力学》第04章在线测试(国外英文资料).doc
- “一带一路”计谋构想的平安计谋效应(下))83分(国外英文资料).doc
- 《修建工程定额与预算》第05章在线测试(国外英文资料).doc
- 《修建工程定额与预算》第16章在线测试谜底(国外英文资料).doc
- 《修建工程施工》模拟试题一 谜底(国外英文资料).doc
- ※发电装备靠得住性治理信息系统装置仿单(国外英文资料).doc
最近下载
- 高中生物三年课程规划及教学进度表.docx VIP
- 医院检验科会议记录范文.docx VIP
- 新教材 人教版高中英语选择性必修第一册全册各单元知识点提炼汇总(单词短语句型语法详解及扩展).docx VIP
- 普通地图编制第九章 地图内容的表示方法.ppt
- 粮油仓储管理员(高级)职业技能鉴定参考试题(附答案).doc VIP
- 儿童学习小提琴 第1册_11520931.pdf VIP
- 变电站综合自自动化系统维护和运行.ppt VIP
- XXX市商业银行灾备切换演练整体方案.docx VIP
- 17J008 挡土墙(重力式、衡重式、悬臂式)(必威体育精装版).pdf VIP
- 堆取料机轨道安装施工方案(打印版).doc VIP
文档评论(0)