- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《修建工程施工》模拟试题一 谜底(国外英文资料)
《建筑工程施工》模拟试题一 答案(国外英文资料)
The first semester of the 2006 academic year of the zhejiang institute of industrial and technical technology (A)
proposition
Time you hand it in
copies
class
level
audit
The examination and approval
qid
a
The second
three
four
five
Total score
The partition
10
40
10
20
20
100
One, judge ten points. The correct symbol square root, the wrong sign x is put in the brackets before the inscription.
(x) 1, the steel bar process is bent 180 degrees, and the diameter of the steel bar is 4.9 times the growth value of each bent hook.
(x) 2. The critical strength of concrete with ordinary silicate cement is 5Mpa.
(square root) 3, the quality of brick masonry is horizontal vertical, mortar is full, go up and down seam, catch the reliable.
(x) 4, reinforced concrete columns are set from a structural Angle.
(square root) 5, 40 thick fine stone concrete waterproof layer, with bi-directional steel mesh, its position should be in the middle part.
The concrete strength of the precast pile is 75 percent of the design strength when it is transported and piled.
When mixing concrete, it is appropriate to use stone, cement and sand.
(fx) 8, Ⅱ roofing waterproof layer durability for 15 years.
The free fall of concrete should not exceed 2m, mainly preventing concrete from being isolated.
The method of concrete curing during the 10 and winter period has the heating method, the heat storage method, the electric heating method and the steam heating method.
Two, a total of 40 points. (total 40, 1 in each question. Only 1 of the alternate answers to each question is the most important.)
() 1. The dry foundation pit which is more than 2m is suitable for choosing (D).
A, grab shovel, shovel, C, backhoe D, shovel
() 2, the following ways to prevent the flow of sand are not feasible (D).
A, reduce or balance the pressure of water pressure B to make the water pressure downward
C intercepts the underground water flow D to improve the anti-permeability in the ground
() 3, when
您可能关注的文档
最近下载
- 跨境电子商务就业能力展示.pptx VIP
- 南吕一枝花不伏老PPT课件.ppt
- 2024年华医网继续教育社区获得性肺炎的诊与治答案.docx VIP
- 《财经法规与会计职业道德》习题答案及解析.pdf VIP
- 水中桩基安全专项施工方案.pptx VIP
- 南芯产品规格书SC8905.pdf
- 名人-李大钊 -人物介绍.pptx VIP
- 梅建强教授治疗药物依赖性失眠经验总结-来源:现代中西医结合杂志(第2022012期)-河北省中西医结合学会、中华中医药学会.pdf VIP
- 2024年二建继续教育-项目管理实施规划(施工组织总设计)编制(必修)1、及答案.docx VIP
- 《企业内部控制基本规范》.pptx
文档评论(0)