- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Little Field simulation Strategy and report
B6016 Managing Business Operations
Report on Littlefield Technologies Simulation Exercise
By Group 4:
Anise Tan Qing Ye
Aneel Gautam
Chu Kar Hwa, Leonard
Tan Kok Wei
Ranking
Reflecting on the simulation exercise, we have made both correct and incorrect decisions. Nevertheless, although we ranked 4th (Exhibit 1: OVERALL TEAM STANDING), we believe we gained a deeper understanding of queuing theory and have obtained invaluable experience from this exercise.
Rank Team Cash Balance ($) 1 bigmoney1 1,346,320 2 techwizard 1,312,368 3 makebigmoney 1,141,686 4 beaters123 895,405 5 donothing 588,054 6 mas001 472,296 Exhibit 1 : OVERALL TEAM STANDING
Decisions Made
A summary of the rationale behind the key decisions made would perhaps best explain the results we achieved.
.
Decision 1
DayParameterValue54 station 1 machine count 2
When the exercise started, we decided that when the lead time hit 1 day, we would buy one station 1 machine based on our analysis that station 1 takes the longest time which is 0.221 hrs simulation time per batch. (Exhibit 2: Average time per batch of each station).
As day 7 and day 8 have 0 job arrivals, we used day 1-6 figures to calculate the average time for each station to process 1 batch of job arrivals. Base on the average time taken to process 1 batch of job arrivals, we were able to figure out how many batches each machine can handle.
daynumber of jobs arriving each dayutilization of station 1, averaged over each dayutilization of station 2, averaged over each dayutilization of station 3, averaged over each day120.4330.0790.019220.2720.1580.108310.3980.1060.1654000.0520520.330.0790.06610.3320.1580.013Average process time per batch0.2210.0790.046Maximum batch processed a day4.5212.6621.74Exhibit 2: Average time per batch of each station
We did not pay much attention to the station 3 machine at this stage even though there appears t