- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
华南理工大学研究生初试考试入学真题英语翻译
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises
您可能关注的文档
- 化工产吨甲酸环评表修改版.doc
- 北京分公司个人中心验车工作手册版正式版.doc
- 北京交通大学学业及职业生涯规划书分o∩_∩o~.doc
- 北京大区机构及职能副本.doc
- 北京奥福榆中钢铁mw煤气发电工程.doc
- 化学副值工作标准.doc
- 化工管道设计中的问题初探集锦.doc
- 北京市公务员录用考试《行政职业能力测验》试卷.docx
- 北京市居民卫生与人群的健康报告.doc
- 北京奥运会大型活动项目工作分解结构.doc
- 2024国家开放大学专科《医学免疫学与微生物学》期末试题及答案.pdf
- 2024国家开放大学(电大)本科《会计学概论》考试复习重点试题及答案.pdf
- 2024国家开放大学(电大)《会计学概论》考试复习重点试题(真题题型).pdf
- 2024国家开放大学(电大)本科《会计学概论》考试真题题型及答案.pdf
- 2024大学新生军训个人心得体会汇编15篇完整版 .pdf
- 2024复苏中心建设与管理急诊专家共识要点 .pdf
- 2024大同市国企招聘考试真题 .pdf
- 数学湘教版自我小测:归纳类比.docx
- 2024基于TACE联合治疗原发性肝细胞癌的研究进展(全文) .pdf
- 2024圣诞节促销策划方案圣诞节策划活动方案 .pdf
文档评论(0)