- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
华工食品专业考研复试相关题目
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 内容四川师范大学毕业论文与设计工作手册.doc
- 冲涌整治加固工程施工组织设计.doc
- 分《如何正确认识和处理新时期人民内部矛盾》试卷.doc
- 刑法之侵犯公民人身权利、民主权利罪司考三大本分段学习.doc
- 创业者说一个创业者的个人经验.doc
- 分部子分部工程代号索引表.doc
- 分钟面试招到核心员工.doc
- 列车值班员招聘复习题.doc
- 初中政治教师招聘考试高度仿真试题卷及参考答案二.doc
- 分解、蒸发施工组织设计.doc
- 2023年江苏省镇江市润州区中考生物二模试卷+答案解析.pdf
- 2023年江苏省徐州市邳州市运河中学中考生物二模试卷+答案解析.pdf
- 2023年江苏省苏州市吴中区中考冲刺数学模拟预测卷+答案解析.pdf
- 2023年江苏省南通市崇川区田家炳中学中考数学四模试卷+答案解析.pdf
- 2023年江西省吉安市中考物理模拟试卷(一)+答案解析.pdf
- 2023年江苏省泰州市海陵区九年级(下)中考三模数学试卷+答案解析.pdf
- 2023年江苏省苏州市高新二中中考数学二模试卷+答案解析.pdf
- 2023年江苏省南通市九年级数学中考复习模拟卷+答案解析.pdf
- 2023年江苏省南通市海安市九年级数学模拟卷+答案解析.pdf
- 2023年江苏省泰州市靖江外国语学校中考数学一调试卷+答案解析.pdf
文档评论(0)