- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土木工程专业外语混凝土含翻译
PAGE \* MERGEFORMAT9 1 The principles governing proper placement of concrete are: 2 Segregation must be avoided during all operations between the mixer and the point of placement, including final consolidation and finishing. 3 The concrete must be thoroughly consolidated, and should fill all angles and corners of the forms. 4 Where fresh concrete is placed on hardened concrete, a good bond must be developed.5 The temperature of fresh concrete must be controlled from the time of mixing through final placement, and protected after placement. 。6 Concrete may be conveyed from a mixer to point of placement by any of a variety of methods and equipment, if properly transported to avoid segregation. Selection of the most appropriate technique for economy depends on jobsite conditions, especially project size, equipment, and the contractor’s experience. In building construction, concrete usually is placed with hand-or power-operated buggies; drop bottom buckets with a crane; inclined chutes; flexible and rigid pipe by pumping; shot-crete, in which either dry materials and water are sprayed separately or mixed concrete is shot against the forms; and for underwater placing, tremie chutes (closed flexible tubes). For mass concrete construction, side-dump cars on narrow-gage track or belt conveyers may be used For pavement, concrete may be placed by bucket from the swinging boom of a paving mixer, directly by dump truck or mixer truck, or indirectly by trucks into a spreader. 7 Even within the specified limits on slump and water-cementitious materials ratio, excess water must be avoided. In this context, excess water is presented for the conditions of placing if evidence of water rise (vertical segregation) or water flow (horizontal segregation) occurs. Excess water also tends to aggravate surface defects by increased leakage through form openings. The result may be honeycomb, variations in color, or soft spots at the surface. 8 In vertical formwork, water ri
您可能关注的文档
最近下载
- 免费小学生竞选班长卡通PPT模板 (31).pptx VIP
- 电动汽车控制系统及检修课件-第一部分.pptx VIP
- 高中研究性学习调查报告PPTppt.pptx VIP
- 2025年高考英语阅读理解238个抢分关键词+572个高频词.doc VIP
- 4)-A統計基礎及品質統計.ppt VIP
- 2025必威体育精装版贵州省专业技术人员继续教育公需科目考试题库及答案(全)).docx VIP
- 赵海洋 十年 完整钢琴谱.pdf VIP
- 2025年高考语文备考之文言文《古文观止》训练50篇.pdf VIP
- 青岛版数学一年级上册《20以内的进位加法》单元整体备课设计.docx VIP
- 2025至2030中国跑腿服务行业市场分析及竞争形势与发展前景预测报告.docx
文档评论(0)