- 1、本文档共30页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ESD测试介绍讲义
EUT表面涂漆 If the coating is not declared to be an insulating coating by the equipment manufacturer, then the pointed tip of the generator shall penetrate the coating so as to make contact with the conducting substrate. Coating declared as insulating by the manufacturer shall only be submitted to the air discharge. The contact discharge test shall not be applied to such surfaces. 对EUT表面涂漆的测试方法选用AD/CD(by Manufacture): ——金属shell表面非绝缘的涂层需要破开涂层进行接触放电 ——金属shell表面以绝缘为目的的涂层不需要破坏,以空气放电进行测试 ——也有客户要求AD/CD两种方法都需要测试 ——一般在非金属表面的导电涂层是肯定不能破坏的,用空气 ——只有在金属表面的绝缘涂层需要判断 About bleeder resistors cable…… The presence of the cable with the bleeder resistors can influence the test results of some equipment. A test with the cable disconnected during the ESD pulse takes precedence over the test with the cable installed during the test, provided that the charge has sufficiently decayed between the successive discharges. 对不接地设备进行辅助排放滞留电荷(也有不使用的情况(对于泄放死的EUT)。 - the time interval between successive discharges shall be extended to the time necessary to allow natural decay of the charge from the EUT; 延长施加时间 sweeping of the EUT with a grounded carbon fibre brush with bleeder resistors (for example, 2 × 470 kΩ) in the grounding cable. 放电纤维刷 NOTE In case of dispute concerning the charge decay, the charge on the EUT can be monitored by a non- contacting electric field meter. When the charge has decayed below 10 % of the initial value, the EUT is considered to be discharged. (判断EUT电荷衰减-不适用,确保EUT运行稳定,听/看) post-installation tests( situ ESD testing) These post installation tests, which are performed in situ, may be applied when agreed between manufacturer and customer. It has to be considered that other co-located equipment may be unacceptably affected. NOTE In addition, the EUT itself may suffer significant ageing from in situ ESD testing. The mean time to failure (MTTF) of many modern electronic
您可能关注的文档
- ERP教程讲义.ppt
- ERP生产制造解决方案V1.0讲义.doc
- ERP概述01讲义.ppt
- ERP期末大作业-ERP项目实施模拟和演练讲义.doc
- ES6新特性概览讲义.doc
- es6实例讲义.ppt
- ESB分享讲义.ppt
- ERDASLPS工作站使用指南翻译-第五章数字摄影机使用指南讲义.doc
- ERP的基础概念和基础数据讲义.ppt
- ERP沙盘模拟经营讲义.ppt
- 湖北省恩施土家族苗族自治州2024-2025学年七年级下学期期末考试地理试卷(含答案).pdf
- 黑龙江省绥化市望奎县(五四学制)2024-2025学年六年级下学期7月期末考试数学试卷(含部分答案).pdf
- 湖北省恩施土家族苗族自治州2024-2025学年七年级下学期期末考试英语试卷(含答案).pdf
- 2025国家电投集团资本控股有限公司本部招聘8人(北京)笔试历年参考题库附带答案详解.pdf
- 2025安徽阜阳临泉县新泉管理投资有限公司招聘6人笔试历年参考题库附带答案详解.pdf
- 湖北省仙桃市2024-2025学年高二下学期期末质量监测生物试卷 - 原卷.pdf
- 2025年福建厦门轮船有限公司船舶修造厂招聘1人笔试历年参考题库附带答案详解.pdf
- 湖北省襄阳市2024-2025学年高二下学期7月期末统一调研测试生物试卷(有答案).pdf
- 湖北省仙桃市2024-2025学年高二下学期期末质量监测生物试卷.pdf
- 2025河南城发水务发展有限公司/城发新环卫有限公司招聘29人笔试历年参考题库附带答案详解.pdf
文档评论(0)