The construction site management goal is to build an orderly and civilized construction site.docVIP

The construction site management goal is to build an orderly and civilized construction site.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
TheconstructionsitemanagementgoalistobuildanorderlyandcivilizedconstructionsiteTheconstructionsitemanagementgoalistobuildanorderlyandcivilizedconstructionsite

The construction site management goal is to build an orderly and civilized construction site, safety, environmental protection, Six, the informationization management Mechanical and electrical engineering construction general contracting units to establish information network covers all subcontractors and suppliers, Keep all kinds of information channels and effective to prevent error, prompted during construction activities orderly. 1 h420024 commissioning stage of the project management tasks Have a single machine no-load commissioning, linkage no-load commissioning, load test run three, Only single no-load commissioning belong to the category of construction work, after the commissioning of the two is by engineering construction general contracting unit bearing In the general contract, to make agreement. Case 1 h420020-1 】 【 The background, A company bid for a large aluminum smelter construction general contracting management, project department in order to improve the quality of management, to ensure the performance of the total The contract all the commitments, before the start of the management staff training and test results. Clearly put forward the training Management requirements, including the construction progress plan shall establish a mechanism and so on, each link to keep silence, all kinds of instructions issued after compaction With respect to feedback, has a processing opinion, feedback closed loop control. For quality supervision and management personnel to point the quality supervision and management The path of the work. The following two event happened in engineering construction: Incident: subcontractors will be contracted projects in the vacuum pump room LAN no-load commissioning plan submitted to the general contracting unit of examination and approval , fight for progress and ask homework personnel mount guard electricity at boot, by general contracting unit technology, safety management department to stop, to For correct.

文档评论(0)

cxiongxchunj + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档