- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
HowtocalculateexcavatorsproductivityHowtocalculateexcavatorsproductivity
How to calculate excavators productivity Productivity is one of the main technical and economic indexes of hydraulic excavator, it said in a unit of time from the face in mining and unloading soil transport vehicles or spoil bank earthwork volume. How many cubic meters per hour usually dug as a unit, on the site is also useful to dig out day and night shift or earthwork volume to represent. The general concept of three kinds of productivity. The 1 theory of productivity The theory of productivity refers to an excavator working hours in condition the productivity. Condition may be taken as: (1) a skilled driver operation, fully consider the machinery for single action combined oil and possibilities for composite action, such as moving arm birth and turntable at the same time, the boom and the bucket rod hydraulic cylinder working alone can be combined oil etc.. (2) select the most frequent working conditions and the average size of work. As taking the most frequently excavated soil as the calculation of soil. The backhoe, half maximum digging depth is calculated as mining depth, the average height of the loading height or spoil bank as calculated by dumping height, take 90 ° as one-way rotary turntable angle. (3) face, transport vehicle (spoil bank) and the relative position between the appropriate selection of excavators, truck, with a good. Theory of productivity calculated: Q = 60qn (m3 / h) Type: Q as the theory of productivity; N per minute work cycle theory value; Q bucket geometrical capacity (cubic meters) Productivity refers to the maximum productivity machinery in the conditions for work an hour can get. The given conditions including soil conditions, the bucket fill, loading conditions. The actual productivity is mechanical practice over a period of time the average productivity. To calculate the actual productivity mainly consider two factors, namely, the utilization rate of the machine and the driver proficiency, actual productivi
您可能关注的文档
- How to achieve success on campus 2.doc
- How to be a good English teacher.doc
- How to be a passionate English Teacher?.doc
- how to choose a Good PE Foam Sheet Extrusion Line.doc
- How to find the main idea of a paragraph.doc
- How to Get the Poor off Our Conscience.doc
- How to Hedge against Risks in International Trade.doc
- How to Read a Poem.doc
- How to study and learn.doc
- How to Write a Cover Letter.doc
- How To Write A Process Essay.doc
- How to Write Clearly.doc
- HP glossary.doc
文档评论(0)