templte to model the way in the set.docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
template to model the way in the set, through inspection qualified rear can implement the whole project, and ensure the quality of the whole project in line with the requirements of process standards. 6.2.2.5 concrete engineering quality assurance measures 5-1 concrete strictly in accordance with the requirements of the concrete construction specifications; Once completed for continuous casting. 5-2 before pouring, measures must be formulated strict pouring and pouring route, and detailed technical clarificaiton. 5-3 concrete mixing of raw material must be strictly controlled, and control the temperature, and ensure the temperature loss in transit within the prescribed scope. 5-4 before pouring into the mould temperature of concrete, concrete layer continuous casting, casting the strictly control layer, each layer height is not more than 40 cm, to avoid the time is too long to produce construction cold joint. 5 - to control the generation of cracks and make full use of the later strength of concrete, reduce the dosage of cement in concrete, preventing the early cracking of concrete; In roof concrete used in construction, the second of plastering construction process of concrete early crack. 5-6 contact the meteorological department in advance before concrete pouring, query, as far as possible to avoid cold weather pouring concrete, especially the rain and snow weather, in case of rain and snow is a moratorium on the casting, and to have completed the construction and implicit inspection qualified face in striped cloth covers, prevent the rain and snow into the structure template, affect the quality of concrete. 5 to 7 after concrete pouring, the heat preservation, moisture curing of concrete, slow cooling, give full play to the creep of concrete, reduce the temperature stress. 5-8 side walls should formulate detailed technical measures, to prevent the run mode. 6.2.2.6 foundation drainage measures 6.2.2.6.1 precipitation scheme Before construction seriously understa

文档评论(0)

xciqshic + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档