- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级维修电工模试题B
construction work area in the form of conference reviews. 2 review program review date is determined by the project manager; According to the project manager of project quality control Department requires preparation of a management plan, representative of the management audit of the project, approved by the project manager; Review Project Office issued notices of meetings; Project manager facilitates the review meeting, scheduled content under review; Quality control Department is responsible for the records, the preparation of the review report and corrective action plan, representative of the management audit of the project, approved by the project manager; Quality control Department is responsible for the preparation of records and reports the distribution list, or publish to the Internet by engineering part of the project staff and departments. Organized by the quality control Department is responsible for tracking the implementation of corrective measures inspections. 3.4.5 the output from the management review shall include the following elements: the effectiveness and suitability of the quality management system, whether it be maintained and revised; Quality policy and quality objectives are achieved and to meet customer requirements, whether it be maintained and revised; The allocation of resources to meet requirements, whether you need to add or adjust. 3.4.6 corrective action tracking and verification on the issues raised in the review, by the primary responsibility of departments draw up corresponding specific corrective, preventive and corrective measures, and seriously implemented. Project quality control Department is responsible for the tracking, verification and evaluation the effect of corrective and preventive actions. 3.4. ... 1 the safety programs and departments dealing with the formation of urban spatial
construction work area in the form of conference reviews. 2 review program review date is determined by the project manager; According
您可能关注的文档
- 初步施工组织设N3标段.doc
- 初级Openwt编译详细教程.docx
- 初级会计实务-十四章模拟测试题及答案.doc
- 初级会计实务模试题(一).doc
- 初级会计实务模试题一及答案.doc
- 初级会计实务真回顾8.doc
- 初级会计实务考模拟试题2.doc
- 初级会计实务考模拟试题及答案.doc
- 初级会计电算化作题一.doc
- 初级会计电算化拟试卷(五)修订.doc
- 2023年江苏省镇江市润州区中考生物二模试卷+答案解析.pdf
- 2023年江苏省徐州市邳州市运河中学中考生物二模试卷+答案解析.pdf
- 2023年江苏省苏州市吴中区中考冲刺数学模拟预测卷+答案解析.pdf
- 2023年江苏省南通市崇川区田家炳中学中考数学四模试卷+答案解析.pdf
- 2023年江西省吉安市中考物理模拟试卷(一)+答案解析.pdf
- 2023年江苏省泰州市海陵区九年级(下)中考三模数学试卷+答案解析.pdf
- 2023年江苏省苏州市高新二中中考数学二模试卷+答案解析.pdf
- 2023年江苏省南通市九年级数学中考复习模拟卷+答案解析.pdf
- 2023年江苏省南通市海安市九年级数学模拟卷+答案解析.pdf
- 2023年江苏省泰州市靖江外国语学校中考数学一调试卷+答案解析.pdf
文档评论(0)