管道切割机液压站机械CAD图纸设计.doc

管道切割机液压站机械CAD图纸设计.doc

  1. 1、本文档共36页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
充值下载即送CAD图纸,QQ36396305

摘要 随着现代经济社会的发展,能源短缺的现象日益严重,海洋油气资源的开发呈现出新的前景。石油平台和海底管道安装与拆除技术是海洋油气设备维护维修技术的十分重要的部分。 导管架切割用水下金刚石绳锯机主要用于石油平台和海洋管道中各种导管架的切割作业,这方面技术问题的成功解决,将缩短我国与世界发达国家在这一领域技术水平的差距,并能提高我国在海洋开发方面的国际地位和竞争能力,还可以避免受国外公司技术限制,提高海洋石油开采的效率,降低成本费用。 本论文是以海上石油平台和海底输油管道拆除为背景,设计一台适合于导管等大直径钢质构件(中间灌注了混凝土)切割的水下金刚石绳锯机工程样机的液压站部分。论文通过设计方案分析、设计计算、油源和集成块设计、部分细节设计、设计校核等,细致地给出该液压站的设计方法和设计过程,并给出了液压站的控制工作过程和系统的装配图。 关键词:导管架;金刚石绳锯机;液压站 Abstract As the development of the modern economic society, the phenomenon of energy short is more serious day by day. Thus the exploitation of marine resource especially petroleum and natural gas resources is to show a new prospect. The installation and the demolition of the petroleum platforms and the seagoing pipe lines is the extremely important part of the technology which is used in preserving and servicing the equipment for exploiting the oil and gas. The pipelines frames cutting underwater diamond wire saw is mainly used to cut each kind of pipelines frames which are usually in petroleum platform and seagoing pipe lines. If we successfully solve the problems in this technology, it will be able to reduce the disparity between our country and the world developed country in this scientific domain. And it will be able to improve our country international standing and the competitive power in the aspect of ocean development. And it also can be able to avoid the technical blockade from foreign corporation, to enhance the efficiency in mining the oil and to reduce the cost expense. The paper is designed by the background as the demolition of the marine petroleum platform and the submarine oil pipeline. The paper is to expound how to design an hydraulic pressure station which is the one part of the underwater diamond wire saw that is suited to cut the large diameter steel component such as submarine oil pipeline ( to pour concrete into it)。By analyzing kinds of design proposal, computing the design data, and designing the integrated lumps design, hydraulic pr

您可能关注的文档

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档