经典8D案例分析.doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
经典8D案例分析

客户抱怨回复报告 Customer Complain Reply Report 诉怨日期Complain Date:回复日期Reply Date:经办Prepared By: 客户Customer.:报告编号Report No.:核准Approved By: 主题SUBT: tuds of the cabinet bottom broken 1、问题描述(Problem Description): Frontech customer found ther was transformer movement inside the UPS, and Umax Frontech customer found in some units the Studs of the cabinet bottom were broken, and the transformer clamps are bending. Pictures as below. 2、问题处理成员(Team Members) 3、原因分析(Root Cause Analysis): ’s transformer had used small clamps, some clamps may not be fully tight, and the gaps of the studs were a bit large, so the in some cases the transformer have abit movement, picture as below. The Studs of the cabinet bottom were broken: it seems?the UPS was dropped from high height , we have done the drop test to check this problem,?normally this problem cannot happen. 4、临时性措施(Short-Term Corrective Action): 5、长期性措施(Long-Term Corrective Action): For this loose fitting of transformer issue, we have already changed the transformer clamp, it can fix the transformer full tightly, picture. And we will increase the thickness of the studs in the cabinet bottom , so that the gaps will be reduced, it can?hold the transformer tightly, and the studs will be?more solid , it is not easy to be broken. 6、改善效果(Improved Result): 7、预防再发生措施(Preventive Action): 8、问题结案及感谢的人员(Problem Closed Thanks For Joined Members ): Thankseam members. 。。。。。。。。 Technologies (Shenzhen), Ltd. 客诉类别Complain Sort:■代理商投诉 agent complaint□最终客户投诉 final user Assembly 回复类别Reply Sort: ■初步Original □最终Final 第 3 页 共 3 页

文档评论(0)

liudao + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档