- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Lesson 20 Bench Fitting Irrespective of the machine tool or technique used to manufacture the various parts of the mould, the final responsibility for the finishing of the individual parts and for fitting them together lies with the bench fitter. The mould finishing and assembly procedure adopted by the bench fitter varies from toolroom to toolroom; it is therefore impossible to set down a standard pattern for the work. In consequence, we intend only to indicate the general approach to this problem without going into details. We will do this by considering the various stages in the bench fitting involved in the manufacture of a simple mould. The various stages are listed as follows. Stage1. Finishing the impression When the mould plates are received from the machine tool section, the impression form (on both plates) is in the rough machined state. Cutter marks, burrs, etc., are very apparent on the surface. The bench fitter’s first job is to produce a cavity and core free of machine marks and to the shape and dimensions specified on the mould detail drawing.① Stage2. Aligning cavity and core This operation is to align the two parts with respect to each other so that the molding produced will have the correct wall section. This is achieved by using packing pieces between the cavity and core. The two mould plates are clamped together and returned to the milling or jig boring machine to have guide holes bored through both plates. When this operation is complete, the clamps are removed, the mould plates separated and the guide pillars and guide bushes fitted. The two mould plates are again brought together and checked to ensure that the core is in alignment with the cavity. Stage3. Bedding down This is the process of ‘marrying’ the two opposing mould halves together to prevent the plastic material escaping between the two surfaces when the material is injected into the impression.② One surface (the core plate in our exam
您可能关注的文档
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 2.3.3-4.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 2-4设计要点.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 3-1.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 3-2.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 3-3.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 4-1.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 4-2.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 4-5.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 6.1.ppt
- 模具设计与制造 第2版 普通高等教育“十一五”国家级规划教材 李奇 朱江峰 6.2.ppt
文档评论(0)