- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Automated Procurement 1 - Exercises
Unit: Automated Procurement
Topic: Master Data and Contracts
At the conclusion of this exercise, you will be able to:
Enter the materials planning data for a material procured on a consumption-driven basis
Create a contract and enter it in the source list as a fixed source of supply
To optimize MRP, maintain the materials planning data for a material in the material master record. To make it easier to determine a source of supply, complete some contracts and define these in the system as fixed sources of supply. 1-1 Maintain materials planning data for a material
The material Ballbearing, cylindrical-## is used in production in plant 1000. Requirements of this material are determined automatically by MRP.
1-1-1 Display this material. Determine the material number via F4 help.Which views has the user department already created for this material in plant 1000?
_____________________________________________________
_____________________________________________________
1-1-2 To which material type is this material assigned? _____________________________________________________
1-1-3 Display the purchasing data for this material and determine whether the material is allowed for the “Automatically generated purchase order” function.
Data field:____________________________________________
1-1-4 Create MRP data (MRP 1 and MRP 2) for this material in plant 1000. Take into account the following information:
Requirements are planned for the material using the reorder point procedure. The reorder point is determined manually.MRP type:________________________________________
The MRP controller 0## is responsible for this material.
The reorder point is 100 pieces. A fixed lot size of 300 pieces is procured as required.Fields: _______________________________________________
The planned delivery time is 7 days. You should allow one day for GR processing, which includes quality inspection and placement into storage.
1
文档评论(0)