- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
目 录 第一章:编制说明············································4 编制目的··········································4 编制依据··········································4 编制原则··········································5 第二章、工程概况·············································5 2.1、土建工程概况·······································5 2.2、工程特点与施工条件·································5 第三章、主要项目施工方法、施工方案···························5 3.1、施工顺序···········································6 3.2、工程测量···········································6 3.3、土方开挖与基坑支护································8 3.4、水池地下施工方法······························…8 3.5、钢筋工程··········································11 3.6、模板工程·········································17 3.7、混凝土工程········································23 3.8、墙体工程·········································26 3.9、脚手架工程·······································31 3.10、楼地面工程·······································33 3.11、工程装修·································34 3.12、门窗工程·········································44 3.13、屋面工程·········································38 3.14、防水工程·········································39 3.15、水电安装工程·····································52 第四章、主要物资机械设备计划、劳动力安排计划及劳务分包情况表·58 4.1、主要物资机械设备计划表····························58 4.2、投拟入本工程的主要物资计划·························60 4.3、劳动力安装计划·····································60 第五章、确保工程质量的技术组织措施··························61 5.1、质量管理目标·······································61 5.2、确保工程质量的组织措施·····························62 5.3、确保工程质量的技术措施····························68 5.4、质量保证措施······································72 5.5、成品保护··········································76 5.6、质量通病与防治措施································76 5.7、施工中的计量管理···································77 5.8、工程质量的保修与回访······························79 第六章:确保安全的技术组织措施………………………………………·80 第七章:确保工期的技术组织措施·······························88 7.1总体施工工期控制、阶段管理···························88 7.2总工期及分段工期保证措施·····························89 第八章:确保文明施工的技术组织措施················
您可能关注的文档
最近下载
- 2 1《长征胜利万岁》课件(共35张PPT)(含音频+视频).pptx VIP
- 2025-2026学年湖北省楚天教科研协作体高二(上)起点考试物理试卷(9月)(含答案).pdf
- 2025人民防空防护设备产品选型目录.docx VIP
- 《建筑与市政工程施工质量控制通用规范》.docx VIP
- 执法办案管理中心信息化建设方案(纯方案,117页) .pdf VIP
- 2025年中考英语三轮冲刺:完形填空解题技巧+专项模拟练习题6组(含答案) .docx VIP
- 大型锅炉的热负荷进行了分析.docx VIP
- 哈姆雷特人物形象性格分析.docx VIP
- 2025年北京师范大学计算机应用基础作业一至九全套.doc VIP
- 人教部编版五年级语文上册全册教案)(内含全册备课-单元备课-教学反思-板书设计及).docx VIP
文档评论(0)