毕业设计(论文)--河南煤化集团鹤壁六矿矿井设计.doc

毕业设计(论文)--河南煤化集团鹤壁六矿矿井设计.doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
河南煤化集团鹤壁六矿矿井设计 摘 要 近年来,煤炭行业的发展势头一直很好,越来越多的人力和资金投入到了煤矿的建设和生产中。本设计就是在这样的的前提下对河南集团鹤壁六矿进行实地考察和实习后,经过认真而详细的分析,计算后撰写的。 本设计的井田面积为11.4万平方千米,年产量120万吨。井田内煤层赋存比较稳定,煤层平均倾斜角度为20°,平均煤厚7.5m,整体地质条件比较简单,在井田范围中部有断层发育,矿井瓦斯和二氧化碳含量相对不高,涌水量也不大。根据实际的地质资料情况主要对矿井开拓方式、准备方式和采煤方法进行了初步设计设计时根据现有经济技术条件,尽可能采用先进的开采技术和设备, Abstract In recent years, the coal industry has gooddevelopment momentum, then more and more human and financial resources into the mines construction and production. This design is the premise of this group of Henan Hebi Coal Mine six field visits and internship after careful and detailed analysis, written by calculation. The design of the mine covers an area of 114,000 sq km, annual output of 1,200,000 tons. Occurrence within the coal mine is relatively stable, the average tilt angle of coal seam 20 °, the average coal thickness 7.5m, the overall relatively simple geological conditions in the mine development of the scope of central fault, mine gas and relatively low carbon dioxide, water, not Chung . Geological data in accordance with the actual situation of the main ways to develop the mine, mining methods and methods to prepare a preliminary design, design of the mine shaft to open up the way the two-level, integrated mechanized top coal caving mining technology, to longwall mining method, using All cross-charged goaf treatment. Mine the use of diagonal ventilation, shaft ring road for Dao field, mine and transport, mine hoist, mine drainage and mine ventilation systems and other production equipment selection calculation. Designed in accordance with the existing economic and technological conditions, as far as possible the use of advanced mining technology and equipment, as well as mine safety technology and environmental protection measures required to complete the preliminary design of the entire mine. All mine mechanization, use of advanced technology and high production and high efficiency have been achieved from the modernization of the experience of mine, to achieve a

文档评论(0)

小琪琪 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档