ABB The iron ore mine at Malmberget SVC for voltage support, power factor control and power quality improvement 指导原则(英语).pdf
- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
 
        查看更多 
         
       
 
      
         The iron ore mine at Malmberget: SVC for voltage support, power factor control and power quality improvement An SVC came on line in 2013 at LKAB’s underground mining With the SVC in operation, a stabilization as well as increase facility at Malmberget in the north of Sweden, the second of the mining bus voltage level have been established. SVC for mining supplied to LKAB by ABB in just a couple of years. It is a turnkey installation, rated at 21.5 kV, 0-41 Mvar The SVC is designed to fulfil the following performance requi - capacitive, and with all indoor equipment housed in a pre-fa- rements with all six mine hoists accelerated simultaneously: bricated container. Its purposes are stabilizing the feeding voltage to the mine during varying load cycles, power factor Power factor ≥ 0.99 at the 21.5 kV bus correction as well as power quality improvement in conjunc- tion with planned extensions of the ore mining capacity. The Flicker, Pst (95%) ≤ 1.0 at the PCC SVC has been designed to cope with an ambient temperature span of -40 to +40 deg. C. Max voltage variation caused by the hoists (95%) 1.0 % at the 21.5 kV bus As space is scarce in the substation, the SVC is located some distance away and connected to the 21.5 kV mine bus via Total voltage distortion (95 %) ≤ 1.5 % at the PCC 600 m power cables, a well proven solution in cases like this. Total current distortion (95%) ≤ 5 % at the 21.5 kV bus and The load to be compensated by the SVC consists of six mine the PCC hoists connected to the 21.5 kV bus, four AC converter hoists each rated at 3.99 MW and two 6-pulse DC converter hoists rated each at 8.15 MW, altogether 
       
 
      您可能关注的文档
- ABB Installation Manual for Emax 2 Retrofill Circuit Breakers, DR (Direct Replacement 800A - 5000A) Replacing legacy GE WaveProTM Circuit Breakers used in AKD-10 & Substructures 手册(英语)说明书.pdf
- ABB WER 02 24 数据表(英语)说明书用户手册.pdf
- ABB Manual - 6553 Instrinsically Safe Hydrogen & Purge Gas Monitoring System (Digital Displays - 4689 500 501) 手册(英语)说明书.pdf
- ABB SPCR 8C27 Disturbance Recorder, Product Guide 产品指南(英语).pdf
- ABB 18xxEB_VGA_SPE Manual 手册(英语)说明书.pdf
- ABB Datasheet - Case Story Fripa Tissue 数据表(英语)说明书用户手册.pdf
- ABB Technical Data[EN] BE M4.24.1 数据表(英语)说明书用户手册.pdf
- ABB Easy&Safe 16-32A Pin and sleeve devices 说明(英语)用户手册.pdf
- ABB Technical manual, Bay control REC650 1.2, ANSI 手册(英语)说明书.pdf
- ABB Application example - Orkla 应用说明文档(英语).pdf
- ABB Data sheet - IX IM model - Thermal Dispersion Flow Temperature Switch In-Line Unit 数据表(英语)说明书用户手.pdf
- ABB 5SJA 2000L520300 数据表(英语)说明书用户手册.pdf
- ABB Application manual - SafeMove1 手册(英语)说明书.pdf
- ABB Listening to power control and distribution devices 白皮书(英语)说明书用户手册.pdf
- ABB RET615 5.0 FP1 CN, Transformer Protection and Control, Application Manual 手册(英语)说明书.pdf
- ABB Mounting instruction XE2-XE4, XE2E-XE4E (99) 说明(英语)用户手册.pdf
- ABB Series 200, Hardware Platform, Data Sheet 数据表(英语)说明书用户手册.pdf
- ABB Connection and Setting guide Compact current relay RXHL 421 手册(英语)说明书.pdf
- ABB 2CSM600712D0901_Wireless repeater 手册(英语)说明书.pdf
- ABB MSDS Loctite 574 数据表(英语)说明书用户手册.pdf
最近下载
- 护理事业十五五发展规划(2026-2030).docx
- 护理事业十五五(2026-2030)发展规划纲要.docx
- 青海省2025年中考语文真题试卷附同步解析答案.docx VIP
- DB50T 1015-2020 土地整治项目规划设计规范 .pdf VIP
- 2025-2026学年高中通用技术必修《技术与设计1》地质版(2019)教学设计合集.docx
- 【长租公寓】冠寓运营管理手册.docx VIP
- 2024-2025学年广东省东莞市东华中学九年级上期中物理试卷附答案解析.pdf
- 2025-2026学年东莞市东华初级中学九年级上期中物理试卷附答案解析.pdf
- 民政行政处罚文书(殡葬管理完整版).pdf VIP
- 肾造瘘管相关知识.pptx
 有哪些信誉好的足球投注网站
有哪些信誉好的足球投注网站 
  
 
       
       
      
文档评论(0)