- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
In the second example shown above subcontractor X also delivers a turbine and a pair of wings to the projects but does not invoice them separately. Since there is only one vendor line item, while there are two G/L account line-items there can be no exclusive assignment of the invoice to any particular WBS-element or project. In this case the Project-Based Payment Run checks the account assignments of the G/L account line items in the invoice document. If at least one G/L account line item is part of the project or subproject selected the whole invoice document is cleared. In the example above one of the G/L account line items is assigned to project 1 therefore the invoice is cleared. The respective amounts for each project are passed on to Project Cash Management automatically. Network-Scheduling according to Project Management StandardsScheduling activities is carried out forwards and backwards. This takes into account constraints, calculates their earliest/latest dates, and determines the floats. Based on this, you can analyze the critical activities within the network that helps to optimize it. In addition, actual and forecast dates will have an impact on the schedule during execution. Scheduling does affect Cost- and Resource Planning The project‘s scheduled dates will be used when calculating costs and resources – for this, various distribution rules are predefined (i.e. equally, 20/80). This shows Installation and Inspection Process in DREAMS-NPCS. Actual data is recorded by means of purchasing and sales documents and the customer and vendor subsidiary ledgers. Simulation versions are project versions which can be edited by means of the project planning board.The allows a comparison of options, and evaluation of costs, dates, and capacity requirements without creating or changing an operative project. Procedure: You can save operative projects as versions (sub-trees too) - or -first, create projects as a version without an operative project and chang
您可能关注的文档
- 装配工艺技术培训课程.ppt
- 第9章职业生涯设计与管理.ppt
- MINITAB应用置信区间与假设检验.ppt
- 保险直通车培训资料课件.ppt
- 商事法律培训资料课件.ppt
- sony品牌管理培训资料课件.ppt
- ROHS培训资料课件.ppt
- TPS流程管理(二)培训资料课件.ppt
- 财务分析培训资料课件.ppt
- SPC培训资料课件.ppt
- 高中生借助生物组织培养技术繁殖濒危南沙参课题报告教学研究课题报告.docx
- 大学语文教学中传统节日跨文化比较研究教学研究课题报告.docx
- 区域间人工智能教育师资交流与合作中的师资培训资源整合与共享研究教学研究课题报告.docx
- 数学统计图表在企业知识管理资源分配中的应用研究课题报告教学研究课题报告.docx
- 小学语文教学中整本书阅读教学模式应用效果研究课题报告教学研究课题报告.docx
- 智能研修中问题导向教学策略对教师教学能力提升的研究教学研究课题报告.docx
- 安全作业及培训课件.pptx
- 客运公司安全知识培训课件.pptx
- 16 夏天里的成长 课件(48张PPT).pptx
- 2025《导学案实践现状的调查及案例分析》6400字.doc
有哪些信誉好的足球投注网站
文档评论(0)