Faurecia7QBTRAINING(佛吉亚7QB培训教材).pptxVIP

  1. 1、本文档共51页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
The 7QB of production FAS training presentation;7QB: Level 1 training;3;Breakthrough Quality Plan 7 QB of BQP + 7 QB in Production + 7 QB in Development;BQP#1:Capitalization Transversalization of 8D;; BQP Action #3 #4 : Quick response in daily QRCI; Production Quality ! Pass only good parts to the next stage;Quality starts with cleanliness and order : 5 S;Job Instruction/ Work instruction;1. OK 1st part (FAU-S-PSG-0630);OK 1st part;OK 1st part;7 quality basic;7 quality basic;;OK 1st Part – Mandatory Rules;2. Poka yoke (FAU-S-PSG-0650);Poka Yoke;Poka-Yoke, follow up;Poka Yoke;All PY padlock must be turn to red to ensure the PY will be checked again before the restarting of the production.;Poka Yoke MR;3. Self inspection / Stop at defect (FAU-S-PSG-0620);Self inspection;Stop at defect;Self Inspection – Mandatory Rules;;Final inspection;Management of Final Inspection;Final Inspection – Mandatory rules;Temporary Quality Wall;Temporary Quality Wall;TQW - Mandatory Rules;;Red bins – key points;Red Bins;Sorting rules;1. Red bins are visible, in zoned areas, easily accessible by operators. 2. Each non-conforming part is identified with its defect(s) marked. 3. Repairs and scraps are physically separated (Gap leader audits the content of scrap bins) 4. Red bins are empty at the end of shift (by GAP leader).;Rework under Control (FAU-S-PSG-0640) ;Rework under control;Rework = repair + non-standard operations ? Goal is ZERO REPAIRS Repairs must be specified in the Control Plan and Work instructions, with acceptance criteria!! Non standard operations Repaired parts are identified. Part flow is organized. On-line repair Simple repair (missing component, bad riveting…). Immediate, by operator or GAP Leader. Off-line repair Technically impossible on the line or takes too much time. Quickly, by GAP Leader or designated operator, on dedicated repair station (included in the polyvalence matrix), according to repair instructions. Repairs are recorded. Indicator

文档评论(0)

职教魏老师 + 关注
官方认证
服务提供商

专注于研究生产单招、专升本试卷,可定制

版权声明书
用户编号:8005017062000015
认证主体莲池区远卓互联网技术工作室
IP属地北京
统一社会信用代码/组织机构代码
92130606MA0G1JGM00

1亿VIP精品文档

相关文档