- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
PAGE PAGE 18 The Chinese version of standards has precedence to their English translations which are only for internal reference. 本英文版为内部资料,仅供参考,以中文版为准。 Maintenance and Service Procedure for Petrochemical Equipment– General Equipment Maintenance and Service Procedure for Valves 阀门维护检修规程 SHS 01030-92 (For Trial Implementation) Promulgated by SINOPEC SINOPEC Publishing House Contents 1. General 2. Period and Content of Maintenance 3. Maintenance and Quality Standard 4. Testing and Acceptance 5. Service and Troubleshooting Appendix A Option of Materials for Abrasive Tools (For Reference) Appendix B Codes and Application Ranges of Abrasive Materials Appendix C Size Ranges of Abrasive Materials (For Reference) Appendix D Option of Flanges, Bolts and Gaskets (For Reference) Appendix E Option of Common Packings 1. General 1.1 Subject Matter and Application Range 1.1.1 In this Procedure the period and content of the maintenance, maintenance and quality standard, testing and acceptance, service and troubleshooting of general-purpose valves are defined or described. 1.1.2 This Procedure is applicable to such gate valves, stop valves, ball valves, butterfly valves, check values and safety valves that are used in the Petrochemical industry with the max. working pressure being 98.1 MPa (gauge pressure) and the working temperature ranging from -196 to + 850?C. 1.2 Reference for Preparation SY-21019-73 Maintenance and Service Procedure for Valves of Refineries GB 12241-12243-89 Safety Valves ZBJ16-006-89 Tests and Checks of Valves. 2. Period and Content of Maintenance 2.1 Maintenance Period The maintenance period of valves shall be determined by all enterprises themselves in accordance with the features of the production plant, performances of the medium, corrosion speed and operating cycle. 2.2 Maintenance Content 2.2.1 Clean and check the valve body and partial valve parts. 2.2.2 Replace or repair partial valve parts. 2.2.3 Lap the seal surface. 2.2.4 Rep
您可能关注的文档
- SHS-05025-2004 氨合成塔维护检修规程.pdf
- SHS-5025-1992氨合成塔维护检修规程.pdf
- SHS-05026-2004 水溶液全循环法尿素合成塔维护检修规程.pdf
- SHS-05028-2004 往复式合成气压缩机组维护检修规程.pdf
- SHS-05029-2004 甲醇装置合成反应器维护检修规程.pdf
- SHS-05030-2004 甲醇装置重油汽化炉维护检修规程.pdf
- SHS-05031-2004 甲醇装置废热锅炉维护检修规程.pdf
- SHS-05032-2004 甲醇装置合成气压缩机组维护检修规程.pdf
- SHS-05033-2004 炼厂干气压缩机组维护检修规程.pdf
- SHS-05027-2004 xao酸吸收塔维护检修规程.pdf
- SHS-03044-92(英文版)高速离心泵维护检修规程.doc
- SH B-Z05-95 仪表回路图-石油化工标准.docx
- SHT 1488-1992(2000) 高纯度芳烃中非芳烃的测定气相色谱法.pdf
- SHT 1491-1992(2000) 高纯度烃类结晶点测定法.pdf
- SHT 1493-1992(2000) 工业用1-丁烯中微量羰基化合物 含量的测定.pdf
- SHT 1500-1992(2004)合成胶乳命名及牌号规定.pdf
- SHT 1543-1993(2004)对苯二甲酸二甲酯.pdf
- SHT 1551-1993(2004)芳烃中溴指数的测定电量滴定法.pdf
- SHT 1755-2006工业用甲乙酮.pdf
- SHT 1757-2006工业芳烃中有机氯的测定微库仑法.pdf
文档评论(0)