- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008 精品文档 Surface Casing Regulations District 10 Office is located in Pampa, Texas Texas Railroad Commission - District 10 – Jan 1996 “Zone of Critical Cement” Bottom 20% of casing string with a minimum of 300 ft At multiple stage cementing tool – immediate 300 ft above tool Cement Blend Requirements Cement in the “Zone Of Critical Cement” must meet and/or exceed a compressive strength or 500 psi before drill out and 1,200 psi in 72 hrs Cement above the “Zone of Critical Cement” may contain extenders, however the cement must have a minimum compressive strength of 350 psi in 24 hrs after placement. Also the slurry weight cannot be less than 12.7 #/gal with an API free water of no more than 6 mls per 250 mls of cement according to API RP 10R test procedure 精品文档 Surface Casing Regulations District 10 Office is located in Pampa, Texas Texas Railroad Commission - District 10 – Jan 1996 Centralizers Surface casing string shall be centralized at the casing shoe If a multi-stage cementer is used, above and below the tool Plus 100 ft below the base of the usable quality water, a centralizer shall be placed every fourth joint to the ground surface or to the bottom of the cellar “Operators must notify the District Office in the event that the cement does not circulate to the ground surface” “A temperature survey or cement bond log well be required in the event that the cement is not circulated to the ground surface” 精品文档 Surface Casing Regulations Texas Railroad Commission - District 10 – Nov 2005 Maximum casing depth will not exceed 3500 ft Surface casing shall be set before drilling into known shallow oil and gas formations. “Zone of Critical Cement” Bottom 20% of casing string with a minimum of 300 ft From multiple stage cementing tool to the surface Cement Blend Requirements Cement in the “Z
您可能关注的文档
- Formwork Design Tables课件.ppt
- Fortran 程式语言之编与译(一)课件.ppt
- Fragmentation in Large Object Repositories课件.ppt
- From Fibonacci and Base-12 Factors to Brent Factors课件.ppt
- From Good Laboratory Practice to Total Quality Management 课件.ppt
- FUDAN UNIVERSITYSUN LI JIANMAY 2001课件.ppt
- Functional testing课件.ppt
- Fundamentals of Hydrogeology水文地质学基础课件.ppt
- Funding proposal for WB-Italian TF for Environmental 课件.ppt
- Future Directionsin HCI课件.ppt
文档评论(0)