- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
世行贷款辽宁中等城基础设施项目-TheWorldBankDocuments
PAGE 25 67427 67427 Liaoning Third Medium Cities Infrastructure Project Procurement Plan General Project information: Country: The People’s Republic of China Borrower: The People’s Republic of China Project Name: Liaoning Third Medium Cities Infrastructure Project Loan Number: 7524-CHA Project Implementing Agency (PIA): Liaoning Foreign Fund Utilization Project Office Bank’s approval Date of the procurement Plan [Previous Version: January 17, 2012] Date of General Procurement Notice: Jan. 4, 2008 Period covered by this procurement plan: 2012-2013 II. Goods and Works. Prior Review Threshold: Procurement Method Prior Review Threshold Comments 1. ICB?(Goods) All Contracts 2. NCB (Goods) ≥ 0.5 million 3. Shopping (Goods) N/A 4. ICB (Works) All Contracts 5. NCB (Works) ≥ 5million 6. Shopping (Works) N/A Procurement Packages with Methods and Time Schedule Bo. Contract/ Package Contract Description Contract Number Contract Type Proc. Method Prior-or Post- review Bidding period Prequalifi- cation Period of Implementation Total Cost Million $ A1 Yingkou Dashiqiao Heating Civil Works 1 Primary network/substations of Central Heat Source Pre-insulated pipe DN25- 900 mm 29,900m; 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations Pre-insulated pipe DN200- 300 mm5033 m; 27substations (0.0023-0.3537 million m2 YKDHC-1 C NCB Prior review Mar .to June 2008 (Completed) No July to Novt.2008 5.405 2 Central Heat Source Plant 4×64 MW heat source plant YKDHC-2 C NCB Prior review Mar. to June. 2008 (Completed) No July to Oct.2008 4.936 Equipments/Material 3 Substation Equipment and Installation 43substation(0.0023-0.3537 million m2 heating area) including 12 building level substations; heat exchanger, pump, water treatment, heat meter and installation electric and auto-control equipment and installation. YKDHG-1 S+I ICB Prior review Mar. to June 2008 (Completed) No July. to Nov. 2008 3.777 4 Central Heat Source Plant installation
您可能关注的文档
最近下载
- 中等职业教育示范学校建设项目建设实施方案.docx
- 牛头刨床课程设计.doc VIP
- 第三届“先行者”心理科普知识竞答练习测试题附答案.doc
- 英语高一英语阅读理解试题有答案和解析及解析.docx VIP
- 第一次工地例会建设单位的发言稿.docx VIP
- TDT 1070.4-2022 矿山生态修复技术规范 第4部分:建材矿山.pdf VIP
- 《企业内部控制》教学课件最终版 7.筹资活动课件新 7.4第七章企业筹资活动控制方法及措施.ppt VIP
- 高中地理高三一轮复习 自然地理 自然地理环境的整体性与差异性 大单元学历案 教学设计附双减作业设计(基于新课标教学评一体化).docx VIP
- 【高考真题】2024年新课标全国Ⅱ卷高考语文真题试卷(含答案).pdf VIP
- 技术交底(全套).doc
有哪些信誉好的足球投注网站
文档评论(0)