- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
调度系统和他们选择Scheduling systems and their selection
毕业设计外文资料翻译 系别: 管 理 系 专业: 班级: 姓名: 学号: 外文出处: ENGINEERING MANAGEMENT PROFESSION 工程管理专业 附 件:1、外文原文;2、外文资料翻译译文。 指导教师评语: 签字: 年 月 日 1、外文原文; Scheduling systems and their selection Scheduling systems Now we are ready to discuss the various methods for scheduling capital construction projects that are available. The two basic methods that will be discussed are bar charts and logic-diagram-based schedules. Both methods are used extensively, and sometimes interchangeably, in project and construction work. Each method has its advantages and disadvantages. Knowing when to select the correct method is half the battle in successfully making and controlling your project schedule. Bat charts The forerunner to the bar chart was developed by two industrial engineers, Frederick W. Taylor and Henry L. Gantt, for scheduling production operations during World War I. the name “Gantt chart” is still in use today to designate certain types of bar charts. It was sometime after World War I that bar-charting was adapted to the scheduling of construction projects. Bar charts are the simplest from of scheduling and have been in use the longest of any of the systems we have available. They offer the advantage of being cheap and simple to prepare; they are easy to read and update, and they are readily understood by anyone with a basic knowledge of the capital projects business. They are still in wide use today, even as a final product of the computerized CPM scheduling system. The main disadvantage of the bar chart is its inability to show enough detail to cover all the activities on larger, complex projects. On large projects, the number of pages required to bar- chart the project becomes cumbersome,
您可能关注的文档
最近下载
- 新解读《JR_T 0105-2014银行数据标准定义规范》必威体育精装版解读.docx VIP
- sgz1000-2000刮板输送机说明书.pdf VIP
- 大学生职业规划大赛《土木工程专业》生涯发展展示PPT.pptx VIP
- 110kV输电线路防雷接地施工详细方案.docx VIP
- 名老中医传承工作室医案记录(眩晕).docx VIP
- 《湖南大学建筑系馆分析》-精选课件.ppt VIP
- 有机化学(高职):醛和酮PPT教学课件.pptx VIP
- 幼儿园大班绘本 蜂蜜失窃谜案 教学课件.pptx VIP
- 化学优质课公开课第3章 微专题7 难溶电解质沉淀溶解平衡图像分析.pptx
- 碎石地基处理施工方案.docx VIP
有哪些信誉好的足球投注网站
文档评论(0)