案例分析用短壁开采的方式来回收煤柱毕业论文外文翻译
英文原文
Exploitation of developed coal mine
pillars by shortwall mining—a case example
A. Kushwaha, G. Banerjee
Central Mining Research Institute, Barwa Road, Dhanbad 826001, Jharkhand, India
Abstract: The shortwall mining technique is similar to longwall mining but with shorter face lengths, ranging between 40 and 90m, with the aim of controlling the caving nature of the overlying upper strata, the load on support and the overall operation of the supports applied at the face. Field observations and three-dimensional numerical modelling studies have been conducted for the longwall panel extraction of the Passang seam at Balrampur Mine of SECL to understand the caving behavior of the overlying upper strata. A large area of the Passang seam adjacent to the longwall panels has already been developed via bord and pillar workings. In this paper, numerical modelling studies have been conducted to assess the cavability of the overlying strata of the Passang seam in the mine over developed bord and pillar workings along with the support requirement at the face and in the advance gallery. The caving nature of the overlying rocks characterized by the main fall is predicted for varying face lengths, strata condition and depths of cover. The support resistance required at the face, the load in the advance gallery and its optimal obliquity were estimated for faster exploitation of the developed pillars in the Balrampur mine by shortwall mining.
Keywords: Exploitation; Shortwall mining; Geo-mining; Obliquity; Block contours; Main fall; Advance gallery
1. Introduction
In India, underground coal production is mostly dependent upon the conventional bord and pillar (room and pillar) method of mining, although the overall output per man shift (OMS) through this method is generally not more than 1 ton in any of the mines [1]. Large areas in all the subsidiaries of Coal India Limited and even in Singarani Coal Companies Limited (India) have been developed via bord and pillar workings. Th
您可能关注的文档
最近下载
- 宏盛微半导体LY3206_Rev1.6.pdf
- 2022年全国统一高考化学试卷真题及答案(全国甲卷)(解析版).docx VIP
- 设计企业级网络架构课件.ppt VIP
- 企业IPO上市流程.pptx VIP
- 江苏省镇江市2023-2024学年八年级下学期期末数学试卷(含答案解析).docx VIP
- 《精神卫生福利机构重大事故隐患判定标准》知识专题培训.pptx
- GB_T 17851-2022 产品几何技术规范(GPS) 几何公差 基准和基准体系.pdf
- 2023-2024学年下学期语文五年级期末检测卷 附答案 .pdf VIP
- (高清版)B-T 23331-2020 能源管理体系 要求及使用指南.pdf VIP
- 石槽村煤矿主斜井胶带输送机安装工程施工组织设计2011年4月10日.doc VIP
文档评论(0)