彩钢板施工方案[](Color steel plate construction scheme []).docVIP

彩钢板施工方案[](Color steel plate construction scheme []).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
彩钢板施工方案[](Color steel plate construction scheme []).doc

彩钢板施工方案[1](Color steel plate construction scheme [1]) Color steel plate construction program [1].txt there are three kinds of people in the world: one is conscience eaten by dogs, two is conscience not eaten by dogs, three is conscience, even dogs do not eat people. ), love is a dream, but I have overslept this contributed by x DOC documents may experience poor browsing on the WAP side. It is recommended that you select TXT first or download the source file to the local machine. One Installation of color board enclosure structure The installation of color board envelope structure is a very important link, which must be paid enough attention to. The same material and different team installation will have different results. First, installation preparation, 1. materials preparation. For small projects, materials need to be ready for a single time. For large engineering, material preparation need step by step according to the construction organization plan, and put forward step by step to the supplier supply list, specify each batch of sheet specifications, types, quantity, connections and accessories such as the number of required specifications list, and shall provide good delivery time and designated storage position. When the goods arrive, the quantity and specifications should be checked immediately, and whether the delivery list is consistent with the actual quantity is checked. When the quality problem is found, it should be dealt with promptly, replaced, replaced or other methods, and the problem should be promptly reflected to suppliers. 2. equipment preparation. Because of its light weight, the color board structure generally does not need large equipment. Machine preparation should be required to complete the construction organization plan, basically have the following: (1) lifting equipment: truck crane, hoist, pulley, pull rod, hanging plate, according to the different engineering area, height, different methods and equipment. (2) portable tool: a

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档