洞室开挖稳定分析、如何建设隧洞外文文献翻译(四篇).docxVIP

洞室开挖稳定分析、如何建设隧洞外文文献翻译(四篇).docx

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
TunnelStability Analysis of Tunnel ExcavationAspillway tunnel for an embankment dam is to be constructed in a poor qualitysandstone. The excavated diameter of the tunnel is about13m and the cover over the roof is 8m. The tunnel is to have a 1.3 m thick un-reinforced concrete liningand,after placement ofthis lifting, a 28 to high portion of the rockfill dam will he over the constructed tunnel.The questions to be addressed are:(1)What support is required in order to excavate the tunnel safely under the very shallowcover? (2)Is the proposed top heading and bench excavation sequence, using drill and blastmethods, appropriate for this tunnel?(3)How will the concrete lining respond to the loading imposed by the placement of 28m of rockfill over the tunnel?In order to answer these questions a series of two-dimensional finite element analyseswere carried using the program PHASE`. The first of these analyses examined the stabilityand support requirements for the top heading excavation. The final analysis included theentire excavation and support sequence and the placement of the rockfill over the tunnel.The rock mass is a poor quality sandstone that, being close to surface, is heavily jointed. The mechanical properties assumed for this rock mass are a cohesive strength C=0.04Mpa,afriction angle of 40 and a modulus of deformation E =1334 MPa. No in situ stressmeasurements are available but, because of the location of thetunnel in the valley side, it hasbeen assumed that the horizontal stress normal to the tunnel axis has been reduced by stress relief.The model is loaded by gravity and a ratio of horizontal to vertical stress or 0.5 is assumed. A simplifiedversionofthe model was used toanalyse the stability and supportrequirements for the top heading. This model did exclude the concrete liningand the benchexcavations.The first model was used to examine the conditions for a full-face excavation of the top heading without anysupport. This is always a useful starting point in

文档评论(0)

peace0308 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档