design a new intelligence expert decision making using game theory and fuzzy ahp to risk management in design, construction, and operation of tunnel projects (case studies resalat tunnel)精品.pdf
- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
design a new intelligence expert decision making using game theory and fuzzy ahp to risk management in design, construction, and operation of tunnel projects (case studies resalat tunnel)精品
Int J Adv Manuf Technol (2011) 53:789–798
DOI 10.1007/s00170-010-2852-7
ORIGINAL ARTICLE
Design a new intelligence expert decision making
using game theory and fuzzy AHP to risk management
in design, construction, and operation of tunnel projects
(case studies: Resalat tunnel)
Alireza Aliahmadi Seyed Jafar Sadjadi
Meisam Jafari-Eskandari
Received: 7 June 2009 /Accepted: 20 July 2010 /Published online: 4 August 2010
# Springer-Verlag London Limited 2010
Abstract One of the traditional methods on managing risk 1 Introduction
is taken using engineering decisions taken during the
project development. In this paper, we propose a new Most of the real-world decision problems occur in a
method for risk assessment of a tunnel project where there complex environment where conflicting systems of logic,
are three main parameters called taskmaster, adviser, and uncertain, and imprecise knowledge need to be considered.
contractor. The proposed model of this paper is built based To face such complexity, preference modeling needs the use
on interactive framework of a game theory where, in of specific tools, techniques, and concepts to reveal the
making decision, each player considers other possible risks available information with the appropriate granularity [ 1,
choices. We implement three-person cooperative game 2]. There are many cases such as choice of alignment or
theory combined with an interactive decision structural selection of construction methods where the risk manage-
model of fuzzy analytical hierarchy process to perform a ment becomes vital in the early stages of a project [3]. The
balance between actions and suitable cooperative strategy purpose of this paper is to present guidelines for managers
for each player. The results
您可能关注的文档
- GGD复盛双螺杆空压机客户培训资料精品.pdf
- Differential GNSS and Vision-Based Tracking to Improve Navigation Performance in Cooperative Multi-UAV Systems.差分GNSS和建立跟踪改善合作Multi-UAV系统的导航性精品.pdf
- 医疗安全知识课件精品.ppt
- 农村商业银行发展分析——以江苏新沂农村商业银行为例分析精品.pdf
- 回收利用废旧玻璃产品再生资源化项目的投资可行性分析精品.pdf
- 农业银行,员工岗位资格培训考试习题集:柜员习题集精品.pdf
- 四川移动磁盘阵列扩容工程投标方案精品.pdf
- ZH房地产公司发展战略研究1精品.pdf
- 太阳活动对地球的影响精品.ppt
- canoe快速入门39394精品.pdf
- 2025届湖北省武汉市新洲区中考历史最后一模试卷含解析.doc
- 辽宁省丹东市第十四中学2025届中考冲刺卷生物试题含解析.doc
- 方兴大道承台砼施工技术交底.docx
- 江苏省扬州市田家炳实验中学2025届中考历史全真模拟试卷含解析.doc
- 2025届黑龙江省杜尔伯特县中考二模化学试题含解析.doc
- 海南省海口九中学海甸分校2025届中考生物模拟试卷含解析.doc
- 江苏省春城中学2025届中考生物全真模拟试卷含解析.doc
- 广东省广州市番禺区广博校2025届中考猜题历史试卷含解析.doc
- 安徽省合肥市重点中学2025届中考四模历史试题含解析.doc
- 河北省衡水市故城县2025届中考生物押题试卷含解析.doc
文档评论(0)