必威体育精装版风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper)精品.doc
- 1、本文档共25页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
必威体育精装版风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper)精品
必威体育精装版风电场运维人员技能考试试卷(Latest wind, electric field operation and maintenance personnel skills examination paper)
Wind farm operators in 2012
Skills examination paper (theoretical part)
First, fill in the blanks (30 empty, 0.5 cents per minute, 15 points altogether)
1. frequency converter according to the main circuit way of classification, can be divided into voltage type inverter and current type inverter.
2. the engine room can be rotated in two directions. The direction of rotation is detected by the proximity switch. When the number of the circle in the same direction of the yaw limit is reached, the limit switch signal will be sent to the control unit, control unit and the quick stop, reverse unmoor.
3. the preventive maintenance of the wind turbine is regularly maintained in strict accordance with the maintenance schedule provided by the manufacturer.
4. when the power system is running, the frequency is controlled by the active power of the system, and the voltage is controlled by the reactive power of the system.
The relationship between the resistance of the 5.PT100 sensor and the temperature conversion is as follows: when the resistance is 100, the temperature is 0 centigrade.
6. tickets should be two copies, a copy should be kept in place of work by the responsible person Shouzhi, another by Licensor receives.
7. if wind speed exceeds a limit, such as 5 or 10 minutes mean (average wind speed), 5 second average (gust speed), must stop working immediately. Maintenance and repair work shall not be carried out. The blade is located at any position between the work position and the oar position.
The measured data points of the wind tower in the 8. wind farm are located at the height of the fan hub, and should include parameters such as wind speed, wind direction, temperature and air pressure.
9. increasing the tower height of the generator can reduce the influence of turbulence intensity.
10. the insulation level of the generator of the wind turbine is usually F clas
您可能关注的文档
- 新版中日交流标准日本语初级教案精品.pdf
- 新人教版小学数学六年级下册 《式与方程》课件精品.ppt
- 新版新起点英语五年级上册重点单词与句型精品.doc
- 新环境房地产公司服务营销策略分析精品.doc
- 新媒体运营策略方案课件教程【精编版】精品.ppt
- 新生儿危重病例评分法草案精品.doc
- 新版新目标八年级上 unit7 Will people have robots? 第四课时课件精品.ppt
- 新版四年级下册Unit5 My clothes B Read and write课件精品.ppt
- 新版职业技能鉴定加油站操作员题库中级精品.doc
- 新生儿惊厥精品.ppt
- 北京市二手车买卖合同5篇 .pdf
- 军队文职人员招聘考试《新闻学》真题精选 .pdf
- 历届茅盾奖作品名单.docx
- 湖北省部分高中联考协作体2024-2025学年高一上学期11月期中考试 化学 PDF版含解析.pdf
- 湖北省武汉市部分学校2024-2025学年高一上学期期中英语试题 含答案.docx
- 江苏省扬州中学2024-2025学年高一上学期11月期中考试 生物 含答案.docx
- 湖北省部分高中联考协作体2024-2025学年高一上学期11月期中考试 生物 PDF版含答案.pdf
- 湖北省新高考联考协作体2024-2025学年高二上学期11月期中联考物理试题 含解析.docx
- 湖北省“荆、荆、襄、宜四地七校考试联盟”2024-2025学年高二上学期期中联考数学试卷 含答案.docx
- 浙江省丽水市五校高中发展共同体2024-2025学年高一上学期11月期中联考物理试题 含答案.docx
文档评论(0)