- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
财务管理与财务分析运营管理课件7推荐
How Constraint Management fits the Operations Management Philosophy Output and Capacity What is a Constraint? Any factor that limits system performance and restricts its output. Capacity is the maximum rate of output of a process or system. A Bottleneck An output constraint that limits a company’s ability to meet market demand. Also called Capacity Constraint Resource or CCR Theory of Constraints (TOC) Short-Term Capacity Planning Theory of Constraints Identification and management of bottlenecks Product Mix Decisions using bottlenecks Long-term Capacity Planning Economies and Diseconomies of Scale Capacity Timing and Sizing Strategies Systematic Approach to Capacity Decisions Measures of Capacity Output Measures Input Measures Utilization Performance Measures in TOC Inventory (I) Throughput (T) Operating Expense (OE) Utilization (U) Where is the Bottleneck?Example 7.1 Barbara’s Boutiquepage 269, Problem 2 Barbara’s Boutique page 269, Problem 2 Solution Barbara’s BoutiqueApplication 7.1 Solution Diablo Electronics Flowchart for Products A, B, C, D Identifying the Bottleneck at Diablo Electronics When ordering from highest to lowest, the profit margin per unit order of these products is B,A,C,D The best product mix: linear programming Drum-Buffer-Rope System Identify bottleneck Where should we keep inventory? (Buffer) Rope? Drum-Buffer-Rope System Drum-Buffer-Rope (DBR): A planning and control system that regulates the flow of work-in-process materials at the bottleneck or the capacity constrained resource (CCR) in a productive system. Drum: the bottleneck schedule it sets the beat or the production rate for the entire plant Buffer: a time buffer that plans early flows to the bottleneck Ensures that the bottleneck is never starved for work. A finished-goods inventory buffer can also be placed in front of the shipping point in order to protect customer shipping schedules. Rope: the tying of material release to the drum beat a communication devic
您可能关注的文档
- 规范化集团公司安全管理制度改革方案-经典推荐版参考.doc
- 解析函数与调和函数推荐.ppt
- 解析动画中角色的重要性动画短片《百万大奖》创作说明推荐.doc
- 西门子数字化工厂-数字化车间-先进制造技术推荐.ppt
- 解析动画作品中的艺术性动画短片《门》创作说明推荐.doc
- 计划的制订与实施推荐.ppt
- 解析几何复习资料推荐.doc
- 解决Q195拉丝用方坯钢气泡缺陷的工艺措施推荐.doc
- 计划工作的工具和技术推荐.ppt
- 计数原理复习资料推荐.doc
- 2024-2025学年人教版9年级数学上册《概率初步》章节测评试卷(含答案详解版).docx
- 2024-2025学年人教版9年级数学上册《概率初步》章节测评试题(含详细解析).docx
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析试卷.docx
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析试题(含答案解析).docx
- 2025年球商测试题及答案.doc
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析练习题(解析版).docx
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析试卷(含答案解析).docx
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析练习题(含答案解析).docx
- 2024-2025学年人教版9年级数学上册《概率初步》定向训练试卷(含答案详解版).docx
- 2024-2025学年人教版9年级数学上册《概率初步》必考点解析试卷(含答案详解).docx
文档评论(0)