- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钟吕水利枢纽复合土工膜防渗面板堆石坝设计说明书 好
钟吕水利枢纽复合土工膜防渗面板堆石坝设计说明书【毕业设计(论文)】-好 Abstract The purpose of this design is to develop the water resources of B Jiang Basinconstructing a power-based taking into account irrigation water supply flood protection and aquaculture Etc of comprehensive utilization efficiency such as the development of inter-basin water conservancy and hydropower project After clearing the purpose of the construction having the basis and conditions of the construction the project is designed as followsB Jiang Project is a composite geomembrane impermeable rock-fill dam height of 530minstalled 6400kWthe design head of power station is 174m the firm capacity is 1461kWwith two engine unit of 3200Kwthe normal water level is 2755mthe length of the main dan is about 2365mthe upstream slope is15 and downstream slope is 14 The primary coverage of the design is ascertain the crest elevationPa-selection the first major building design construction organization design And composed the tender documents of the diversion tunnel and focus on the design special topicthe diversion tunnel construction organization Impermeable composite geomembrane rockfill dam is a new type of dam the impermeable materialcomposite geomembranethe design construction quality control is the dam of such key technology in the design of Chapter VI of the third statement Festival are explained in more detail The diversion tunnel construction project have the characteristics of small construction work on the section tight time limit so its construction technology is the key in the design have the specification of a detailed explanation The design is refer to the general CFRD and some of geomembrane rockfill dam which has been build Pay attention to the detail design of the independent sub-item at the same time considering the unity of the overall projectIn the design of the topic referencing the diversion tunnel that had build the construction of diversion tunnel design organizations is to ensure that the scheduled completion
您可能关注的文档
最近下载
- 儿童系统性红斑狼疮临床诊断与治疗专家共识(2025版).pptx VIP
- 机械设计专业课程设计带式输送机传动装置设计.doc VIP
- 板的配筋 双向板按弹性理论设计.doc VIP
- 5.1.1从算式到方程-人教版七年级《数学》上册大单元教学课件.pptx
- PM0502-06船舶货舱盖修理通用工艺方案.pdf VIP
- [计量标准]JJF 1005-2005 标准物质常用术语和定义.pdf VIP
- 生理学-血液循环 循环生理(思维导图).pdf VIP
- 十八项医疗质量安全核心制度.doc VIP
- PM-船舶吊货杆修理通用工艺方案.doc VIP
- 过氧化氢——化学品安全技术说明书中文MSDS16个部分完整版.doc VIP
有哪些信誉好的足球投注网站
文档评论(0)