- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Job Safety Analysis (JSA),Workplace Risk Assessment现场安全分析
Volume 1
Environmental, Health, and Safety Standards Job Safety Analysis (JSA)/Workplace Risk Assessment 01.05.01*
Revision 2
September 2xxx
Page 1 of 6
*Formerly 01.05.01.A
Denotes Revision
1. PURPOSE
This procedure provides a simple framework for the implementation of task oriented risk assessment to ensure Environment, Health, and Safety hazards are identified and managed so as to minimize the risks of harm to people, damage to property, or damage to the environment.
This procedure does not cover process risk assessment techniques such as Process Hazards Analysis. These are covered by other EHS Procedures.
2. SCOPE
This procedure is applicable to all sites including construction sites. It describes both a qualitative and quantitative method of risk assessment. AP-E will utilize the qualitative method for all level 1 and level 2 risk tasks and the quantitative assessment method for all level 3 risk tasks (refer to European attachment 01.05.01.A.N). In the Americas and Asia requirement is to utilize the qualitative risk assessment method for all tasks regardless of risk level.
3. SUMMARY
3.1 Risk Assessment
Risk Assessment is a process of assessing specific activities and work processes for hazards and risks. It is a systematic method of:
a) Analyzing work activity.
b) Identifying hazards, hazardous situations, and potentially hazardous events.
c) Evaluating risks by considering the likelihood of hazardous events and the nature and severity of the harm that may result.
d) Reviewing existing and possible control options and action priorities.
Consideration must always be given to the hierarchy of controls
( Elimination
( Substitution
( Engineering Controls
( Administrative Controls
( Protective Equipment
e) Judging the acceptability or tolerability of risk.
Note: Advice may be needed from Field EHS when judging certain risks.
3.2 All Persons performing JSA/workplace risk assessments shall have received training in accordance with 02.05.01.
3.
您可能关注的文档
- Economics(Paul Krugman,Robin Wells)(克鲁格曼版经济学学生版).doc
- EMC培训教程之五(九个耗能行业重点节能技术).ppt
- eg6[建筑]。。。工业园物业管理费用测算.doc
- EN233卷状墙纸-墙纸成品,乙烯,塑胶墙纸规格.doc
- EIB智能家居系统.3.26).doc
- Enterprise Risk Management — Integrated Framework(COSO).doc
- EPA方法201A中文翻译.doc
- EPANET管网平差教程(2016.4修订版).ppt
- epon传输设备(olt)安装工程预算..docx
- EPDM卷材防水施工方案(定稿).doc
最近下载
- 第一单元龙的传人第1课我的名字 教案(表格式)一年级美术人教版(2024版).docx
- 广州数控GSK988Ti系列 编程操作手册2017年1月.pdf
- 台达伺服ASDA-AB系列应用技术手册.pdf
- (宪法)完整版课件.ppt
- 20241103-高盛-美国经济分析:2025年消费支出展望,回归正常稳健增速(摘要).docx VIP
- 高盛-中国房地产行业2025年展望-触底在望(摘要).pdf VIP
- 张毅—潜在失效模式与效应分析(三)课件.pptx VIP
- 茶文化考核试题及答案.pdf VIP
- 人教版(2024)七年级地理上册4.2《气温的变化与分布》优质课件.pptx
- 教科版科学三年级上册2空气占据空间吗 (说课课件)(共13张PPT).pptx
文档评论(0)