平煤一矿通风系统专项的设计
平煤一矿矿井通风设计 摘 要:本设计是根据中平能化集团平煤一矿的实际情况进行的局部矿井设计。井田内煤层赋存比较稳定,煤层倾角为3°—19°,平均煤厚1.93m,整体地质条件比较简单。 根据井田资源条件,确定矿井年产量60万t/a,服务年限约为41年。矿井确定采用立井单水平上下山开采,设计采用综合机械化采煤工艺,走向长壁采煤法,用全部跨落法处理采空区;矿井通风系统采用中央并列式,副井进风,中央风井回风通风容易时期 Pa, 通风困难时期Pa,主要通风机选用BDNO24型通风机。设计以个采区、一个综采面、保证矿井设计生产能力。中央并列式 Zhongping of the Group Pingmei Coal Mine Ventilation Design Abstract: The design is based on actual situation of Pingmei coal mine, Zhongping Coal Industry Group in Henan. Coal seam is relatively stable within the mine, seam dip angle is 3 ° -19 °, the average coal thickness is 1.93m, the overall geological conditions is relatively simple. According to the actual situation of geological data , the annual capacity is 0.6 million tons and the length of service is about 41 years. Decided to adopt the shaft of the mine down one level of exploitation, design integrated mechanized mining all high-mining techniques, toward the longwall mining methods, treatment with the entire cross-fall gob. Mine ventilation system is the central paratactic type, l central wind Well is located in Industrial square .The auxiliary shaft use into the wind, the wind well return air. Easy period total resistance of Mine ventilation is 2211.4 Pa and difficult ventilation period is 2697.2Pa, The main fan ventilation machine is the BDNO24type.Design with a panel, a compound mining, a mining face, and two tunneling, ensure that the design of mine production capacity. This design also includes mine elevator, transportation, water drainage and mine ventilation system ’s equipment selection , mine safety technical measures and environmental protection requirements, it aim to make the whole mine the preliminary design more complete. All mine mechanization, use of advanced technology and draw on modern high production and efficiency have been achieved experience of mine, a mine face to achieve high production and efficiency so as to achieve good economic and social benefits. Keywords:the shaft of the mine down one level of exploitation,
您可能关注的文档
最近下载
- 2025至2030年中国报废汽车回收拆解行业市场运行现状及投资规划建议报告.docx
- Unit 2 What do you like about your family Period 1 Ready Go & Sound 教学设计 沪教版(2025)二年级英语上册.docx VIP
- 食品添加剂 甲醇钠标准2023年.docx VIP
- 高一语文上学期《乡土中国》-差序格局教学课件.pptx VIP
- 企业安全生产检查标准化表格.doc VIP
- 中成药的临床合理应用试卷含答案.docx
- 《HIV病毒与艾滋病》课件.ppt VIP
- 第二单元第1课《因地制宜》课件-2025-2026学年人教版(2024)八年级上册.pptx VIP
- 高标准农田建设标准NYT2148-2012.pdf VIP
- 世界少年奥林匹克数学竞赛(中国区)选拔赛省级选拔模拟卷(三)三年级试题(含解析)2025年5月夏季.docx VIP
有哪些信誉好的足球投注网站
文档评论(0)