- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新奥燃气控股集团Consumpt_Scen_Overview_EN_US精选
SAP AG 2005, Scenario Overview: Consumption Data Collection/ * SAP Best Practices for Water UtilitiesScenario Overview: Consumption Data Collection Consumption Data Collection Consumption Data Collection supports the scheduling of meter reading events, the collection of meter readings, and the validation of the meter readings. When the process is completed, the system contains validated and accepted meter reads, ready for the billing scenario We deliver following pre-configured processes via Best Practices: Scheduling Meter reading preparation - batch Periodic meter reading - batch Manual meter reading preparation / entry Meter reading validation Meter reading monitoring Process Overview – Scheduling The objective is to create a meter reading and billing schedule First the portions are created to determine the billing dates, and then the meter reading units (MRU) are created to support these billing dates. Finally a manual review of all dates can be performed to adjust individual schedules. Process flow: Create Parameter records Create Portions Create Meter Reading Units Create Scheduled Records Adjust Scheduled Records Process Overview – Meter Reading Preparation The objective is to organize the meter readings in a planned route and generate Meter Reading Orders (MRO). Within the individual Meter Reading Unit (MRU) the meters is sequenced in the order the meter reader is supposed to read the meter. When MRU is sequenced, meter orders are created, ready for download or manual entry of meter readings Process flow: Maintain meter Reading sequence Create Meter Reading orders Meter Reading Download Process overview – Meter Reading Validation The objective is to validate all meter reads entered into the system and ready for billing. Automatic validation is performed and acceptable meter readings are immediately ready for billing Implausible meter readings are manually evaluated by agents. An agent accepts the reading or requests that a reread be perfor
您可能关注的文档
- 新三版发行规则精选.ppt
- 新世纪以来我国与周边国家贸易情况精选.doc
- 新世界交楼工作程序精选.doc
- 新世纪的化学精选.ppt
- 新世纪日本语教程初级第9-16课练习汇总精选.doc
- 新三角形的分类精选.ppt
- 新三课件含大量图片精典精选.ppt
- 新世纪楼宇智能化解决方案精选.ppt
- 新世纪大学英语第三册第五单元教师课件精选.ppt
- 新中国成立初期的经济状况与人民币的精选.doc
- 2025年分红险:低利率环境下产品体系重构.pdf
- 大学生职业规划大赛《应用物理学专业》生涯发展展示PPT.pptx
- 大学生职业规划大赛《新媒体技术专业》生涯发展展示PPT.pptx
- 七年级上册英语同步备课(人教2024)Unit 3 课时2 Section A(2a-2f)(同步课件).pdf
- 七年级上册英语同步备课(人教2024)Unit 2 课时4 Section B(1a-1d)(同步课件).pdf
- 七年级上册英语同步备课(人教2024)Unit 3课时6 project(课件).pdf
- 2025年港口行业报告:从财务指标出发看港口分红提升潜力.pdf
- 2023年北京市海淀区初一(七年级)下学期期末考试数学试卷(含答案).pdf
- 2026年高考化学一轮复习第7周氯及其化合物、硫及其化合物.docx
- 2023年北京市西城区北京四中初一(七年级)下学期期中考试数学试卷(含答案).pdf
文档评论(0)