MCFB半干法烟气净化工程主要设备的安装手册(英文版).doc

MCFB半干法烟气净化工程主要设备的安装手册(英文版).doc

  1. 1、本文档共67页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MCFB-FGD Installation manual Contents 1.General remarks 2 2.Steel structure instatllation 2 3.electrostatic precipitator installation 11 4. .bag precipitatior installation 25 5.desulphuration tower installation 41 1.General remarks 1.1 The installation manual applies to coal-burning boiler, Municipal solid waste incineration boiler (MCFB) and engineering equipment for semi-dry flue gas purification, including steel structure, electrostatic precipitator, bag precipitator and absorbing tower. 1.2 The minimum technical requirements described by this manual does not make specifications on all the technical details, but the guidebook guarantee precipitator are the quality products that complies with its requirements and current industrial standard. 1.3 Supplements and modifications in the manual caused by the changes of standard and regulations shall be discussed by buyer and seller. 1.4 If the standard described by the guidebook does not conform with the one accepted by buyer, the higher standard shall be carried out. 2. Steel structure installation 2.1 Steel structure installation sequence 图2-1钢结构安装顺序 2.2 Foundations acceptance and base mounting According to the materials of foundations acceptance check data and mark figures on the surface of foundations before steel structure installation. Your attention shall be drawn to the fact that backfill around the foundations shall be tamped Table2-1 allowable deviation of bearing surface and anchor bolt Item Allowable deviation (mm) Bearing surface elevation ±3 Levelness l/1000 Anchor bolt Bolt center deviation 5 Bolt exposed length +20, 0 When columns are lifted and dropped down on concrete, putting shim group on both sides of every anchor bolt to align and level columns. 钢结构在形成空间钢度单元后,应及时对柱底板和基础顶面的空隙采用细石混凝土二次浇灌。 After steel structure is formed into space rigid unit, fine aggregate concrete 2.3 material and steel components acceptance 2.3.1 Inspection of materials 1) There must be warranty a

文档评论(0)

2017meng + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档