- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABS海上浮式结构规范g
RULES FOR BUILDING AND CLASSING
MOBILE OFFSHORE DRILLING UNITS
2001
NOTICE NO. 1 – January 2002
The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2002.
PART 4 MACHINERY AND SYSTEMS
CHAPTER 2 PUMPS AND PIPING SYSTEMS
SECTION 1 GENERAL
7 Pressure Tests (2002)
(Revise and add text as follows:)
In addition to the testing and inspection of materials, as required in Chapter 3 of the Rule
Requirements for Materials and Welding – Part 2, the following tests on the fabricated piping are to
be witnessed by the Surveyor after bending and the attachment of flanges.
Small bore pipes and tubes of less than 15 mm outside diameter may be exempted from the required
hydrostatic tests.
7.1 Fuel-oil Service System
Pressure lines are to be tested before installation to 1.5 times the design pressure of the system, but
not less than 3.4 bar (3.5 kgf/cm2, 50 psi).
7.3 Fuel-oil Suction and Transfer Lines
2
Transfer systems and fuel-oil suction lines are to be tested before installation to 3.4 bar (3.5 kgf/cm ,
50 psi).
7.5 Starting-air Piping
Piping in starting-air systems is to be tested, preferably before installation, to 1.5 times the design
pressure of the system.
7.7 Hydraulic Power Piping
After fabrication, the hydraulic power piping system or each piping component is to be tested to 1.5
times the design pressure.
ABS RULES FOR BUILDING AND CLASSING MOBILE OFFSHORE DRILLING UNITS 2001 1
Notice No. 1 – January 2002
7.9 All Piping
After installation all piping is to be tested under working conditions.
Where it is not possible to carr
您可能关注的文档
最近下载
- 《产品质量鉴定程序规范 总则》.pdf VIP
- 沪科版九年级物理公式复习.pdf VIP
- AQ∕T 2063-2018 金属非金属露天矿山高陡边坡安全监测技术规范(可复制版).pdf
- 高速公路无人机自动巡检可行性探究.pdf VIP
- CR4012022机器人CR认证可靠性等级认证实施细则.pdf
- 再生水管道阀门选型与管理.doc VIP
- 某公司办公区生活区消防检查记录表.docx VIP
- 人教版高一数学必修一练习题-高一数学人教版必修一《集合》练习题3.doc VIP
- 智慧方案光储充一体化系统解决方案.pptx VIP
- IPC-TM-650测试方法手册CN2020必威体育精装版(104个方法)扫描版.pdf VIP
文档评论(0)