WTP主变配电间
CNTIC BSEEC
JV 2.Operation,MaintenanceTrouble Shooting V/P NO. PAGE PROJECT NAME KARNAPHULI WATER SUPPLY PROJECT PHASE1(KWSP)-C1 DOC.NO. CUSTOM CHITTAGONG WATER SUPPLYSEWERAGE AUTHORITY(CWASA) Rev.NO. Sub Title 4Steps of HV power ON/OFF to the WTP
4.Steps of HV power ON/OFF to the WTP
4.1 HV power on of WTP
STEP1. The HV power of Energypac is on to 33kV isolation switch outdoor. The DC power and control power both 3.3kV and 33kV switch on, control loops of VCB is closed. The spring of VCB is charged.
?NORMAL STEP OF HV POWER ON:
① Check the 33kV voltage of INCOMING on meter, it should not too low or too high. When it’s higher than 35kV or lower than 29kV, the VCB will not close to protect load.
② Close the INCOMING isolate HV switch outdoor firmly, then lock it.
③ Close the INCOMING VCB on remote control panel by operate DISCRPANCY SWITCH FOR BREAKER.
④ Check voltage on 2nd remote panel, then close the VCB of main transformer.
⑤ Check MV voltage of transformer,it will be 3.3kV.
STEP2. The HV power from 33kV switch will go to the main transformer by close the HV VCB.
STEP3. The power of main transformer come to MV entrance, if the voltage of main transformer is stable and correct, then close the breaker of INCOMING. If it looks stable, then do flowing step.
STEP4. The MV power is on busbar , we need send it to each pump panel we need.
STEP5. Send MV power to pump drive panel, pump engineer could test and run the motor of pump.
STEP6. Send MV power to LV transformer, set each useful loop standby.
4.2 HV power OFF of WTP
STEP1, Power OFF all MV load breaker, include LV transformer. We do not open HV VCB or switch with MV load.
STEP2, Disconnect the link pad of GEN AUTO-Start, then switch OFF the MV INCOMING breaker.
STEP3, NORMAL STEP OF HV POWER OFF:
① Open the VCB of main transformer.
② Open the INCOMING VCB on remote control panel by operate DISCRPANCY SWITCH FOR BREAKER.
③ If needed, open the INCOMING isolate HV switch ou
您可能关注的文档
- MICE Contract 宴会合同.doc
- 一周突破四级英语复习材料.doc
- 雅思初级词汇5000.doc
- 四六级听力-151组易混淆拼错的词汇.doc
- 美国旅游计划【中文版对照版】【签证申请必备】--匹兹堡.doc
- Advertisement 2月26.docx
- 华南农业大学 2009 ACM题目.doc
- 2014洛阳二外小升初英语试卷.doc
- 供砂合同英文版 Supply Sand Agreement (新加坡-马来西亚).doc
- 缩略语对照大全.doc
- 北师大版小学数学三年级上册《寄书》教学设计.docx
- 统编版(部编版)语文二年级上册《雪孩子》教学设计.docx
- 统编版(部编版)语文二年级上册《八角楼上》教学设计.docx
- 北师大版小学数学三年级上册《长方形周长》教学设计.docx
- 北师大版小学数学三年级上册《丰收了》教学设计.docx
- 统编版(部编版)语文二年级上册《夜宿山寺》教学设计.docx
- 统编版(部编版)语文二年级上册《风娃娃》教学设计.docx
- 统编版(部编版)语文二年级上册《朱德的扁担》教学设计.docx
- 统编版(部编版)语文二年级上册《难忘的泼水节》教学设计.docx
- 统编版(部编版)语文二年级上册《纸船和风筝》教学设计.docx
文档评论(0)