张力腿平台英文展示.pptVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
张力腿平台英文展示

Company Logo LOGO Company Logo Company Logo Profile of tension leg platform content 1 2 overview Offshore platform The rig Production platform Jacket platform Seated platform Jack-up platform Semisubmersible platform Tension leg platform TLP SPAR platform Structure 3 Working principle The tension leg platform, through its own structural form, produces much more buoyancy than the structure itself, and the rest is called residual buoyancy. The residual buoyancy and the pretension balance. Semi-compliant semi-rigid: The pretension causes the tension leg to be tense in tension, so that the motion (rolling, pitching, and hanging) of the platform plane is smaller and is similar to rigidity. 4 5 Working characteristics Good motor performance Large environmental loads can be balanced by inertial forces, without the need to balance them through structural internal forces. Higher security The natural frequency of motion in the plane of the platform is lower than the wave frequency, while the natural frequency of motion outside the plane is higher than the wave frequency. The water depth is 300-1500 meters The tension leg platform usually separates the main body of the platform from the upper body and then makes a joint at sea. The entire installation of SeaStar TLP can be divided into four separate phases. 6 Build and install the process Stage 1: installation of seabed foundation (2 ~ 5 days). Stage 2: tension leg installation (2 ~ 5 days). Stage 3: Installation of the main body of the platform (1 day). Stage 4: installation of the upper body of the platform (1 day). According to the general structure classification Can be divided into two broad categories, the first generation of tension leg platform and the second generation of tension leg platform; According to different classification of tree of oil tree It can be divided into two categories: wet tree platform and dry tree platform; Categorize functions and applications It can

文档评论(0)

ctuorn0371 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档