- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Software Design Specification:软件设计规范
Software Design Specification
Electronic Inspection Scheduler
Jim Coan
Joe Wolford
Chris Lesnieski
CIS 495 – Senior Design
Dr. Maxim
November 10, 2005
Introduction
This software is being created to replace the paper version of the building inspection schedule for the Building and Safety department at the City of Dearborn. The program is going to store past inspections, and future inspections. In addition to the storage of information for the scheduling it will also have some added functionality. The additional criterion for the program is the following:
Each inspector will have limited inspections during a specific day, will be flexible each day and controlled by the application.
Each inspector will have inspections in the East and /or west end in each day
Program will identify and skip holidays, days off and inactive inspector.
Data entry clerks will have the ability to enter vacation, sick, training time or other reasons for blocking dates and times
Program must allow complete audit trail of all transaction dates, time, users, and workstation ID
Program will print inspection reports by one day, multiple dates, specific inspector, and specific inspector by date range
A calendar on the forms screen to allow user the pick a date, if available, text range on screen is acceptable also
Allow the user to schedule an inspection for the first available date
Allow the user to schedule an inspection for the first available date after a specific date
Allow the user to schedule an inspection for the first available date by specific inspector
All tables will allow adding, searching, modifying and deleting records from the same screen
Drop down menu for selection of records
All drop down menus must allow data entry to add more items without exiting the screen
Goals and ObjectivesThe goals of this project is to replace the current antiquated system that is being used to schedule building inspections. Our objective is to allow scheduling to be done in a more orderly, and
文档评论(0)