水泥工艺学试题1(Cement technology examination questions 1).docVIP

水泥工艺学试题1(Cement technology examination questions 1).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥工艺学试题1(Cement technology examination questions 1)

水泥工艺学试题1(Cement technology examination questions 1) The Miller test Completion 1. The operation control of various mill systems is summed up as follows: the preparation before the start of the car and the operation of stopping and opening, allowing the mill to run and the conditions that can not be running and the inspection work in operation. 2, limestone, clinker and other materials must have a certain inventory reserves, should generally meet more than 4 hours of production needs. 3. What are the items that need to be checked before the mill is driven? 4, the normal driving sequence is reverse flow boot. 5 start the gear reducer and main bearing lubrication pump and other lubrication system before the mill starts. 6, the mill under normal circumstances of the parking order is, first opened the device after the stop, after the start of the first stop equipment. 7, the new or after the overhaul of the mill, the mill must be no grinding body and materials in the case of empty test run, its running time shall not be less than 18 hours. 8. Inspection during ball mill operation includes inspection of feeding system, inspection of grinding and transmission parts, inspection of lubrication system, and inspection of operation of auxiliary equipment. 9. In practice, the basis of adjusting feed quantity can be adjusted according to the change of grinding sound. The electric ear is used to detect the grinding sound and control feed, and the feed quantity is adjusted according to the fineness of the grinding mill. 10 the factors influencing drying grinding operation are the main form of lining plate, grinding media grading and load, speed of mill, cyclic loading rate, separation efficiency, material moisture content and particle size, the volume of feed, hot air temperature and velocity etc.. 11. Before drying the mill, preheat the mill first. When stopping, stop the hot air first, then stop feeding and stop grinding at last. 12, the full grinding (stuffy grinding, full grind

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档