料石施工(Stone construction).docVIP

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
料石施工(Stone construction)

料石施工(Stone construction) Stone masonry construction quality management 1, according to standard: unified standard for construction quality acceptance of building engineering GB503002001 Code for acceptance of construction quality of masonry engineering GB502032002 Code for design of masonry structures (2002 GB500032001 partial revision) Code of acceptance of construction quality of building foundation GB502022002 Than design rules of JGJ982000 with masonry mortar 2 、 construction preparation 2.1 materials and main equipment: 2.1.1 stone: its varieties, specifications, colors must comply with the design requirements and the relevant construction specifications, there should be factory certification. 2.1.2 sand: coarse and medium sand should be used. 5mm sieve through the sieve, preparation of less than M5 mortar, sand content of mud shall not exceed 10%; equal to or greater than M5 mortar; sand content of mud shall not exceed 5%, shall not contain grass roots and other debris. 2.1.3 cement: generally use 325 slag Portland cement and ordinary Portland cement. There is a factory certificate into the re examination sheet. If the factory date is more than three months, the result shall be used by reinspection. 2.1.4 water: clean water with running water or no harmful substance. 2.1.5 other materials: Rachel tendons, embedded parts should do the antiseptic treatment. 2.1.6: the main equipment should be equipped with blender, sieve, hand shovel, hammer, shovel, supporting board, line sinkers, horizontal ruler, steel tape, small white, half barrels, broom, tool bag, trolley, leather pole etc.. 2.2 operating conditions: 2.2.1 foundation, cushion has been completed, and has completed the hidden inspection procedures. 2.2.2 foundation, cushion surface has been playing good axis and wall line, set a good leather rod, in which distance from about 15mm is appropriate. The number of leather bars should be set at the corner, and the number of the leather and the height of the maso

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档