- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
拉延模设计(Drawing die design)
拉延模设计(Drawing die design)
The second chapter is the design process of drawing die structure
Section 2.1 technical requirements
Each project will sign the technical agreement with customers (or other similar documents), technical agreement contained in the relevant information on all customer mold requirements, should carefully read the technical agreement before the start of each project.
After receiving the production tasks, should first check method, understand the relevant information, including a name, product material, material thickness, blank size, production line and machine used in this order, the height of the closed mold etc..
According to the mechanical properties of material and material thickness from the technology agreement (or other documents signed with customers or their own design standards - first customer requirements based on whether the search) mold using soil block structure and mold body and soil block material, if the material is used to block forgings for casting soil structure, overall structure.
The production line is divided into manual production line and automatic production line, automatic production line is divided into ordinary and high speed automatic line line, automatic line mould to design the corresponding induction device is an induction switch, a DC and AC induction switch points, depending on the production line set. Manual production line, process components in two machine tools between the transfer is done by manual, and automatic production line can be robot or manipulator to complete. The most essential difference between high-speed line and common automatic line is in the speed of production.
Usually, the drawing die arrangements in the production line of the first machine tool production (some require blanking products, the machine is not) a single action and double action points according to different production line, the corresponding mold structure also corresponds to the single structure and the structure of doub
您可能关注的文档
- 扳手腕训练文档(Wrench wrist training document).doc
- 批处理的极限应用(Limit application of batch processing).doc
- 找回好睡眠(Get a good sleep).doc
- 找回还原精灵的密码的七种方法(Seven ways to retrieve the restore wizard's password).doc
- 找回丢失的windows 任务栏图标(Retrieve the missing windows taskbar icon).doc
- 找工作的五险一金你懂么(The job five social insurance and one housing fund you know).doc
- 找广告牌上的错别字大全(Find the billboard typos Daquan).doc
- 批处理bat文件实现各种功能(Batch bat file implements various functions).doc
- 找回删除的文件 __一不小心把文(Recover deleted files __ accidentally put a paper).doc
- 技击之神李书文(Li Shuwen, the God of martial arts).doc
- 医疗卫生服务创新与探索.pptx
- 2024-2025学年结构工程师常考点试卷附参考答案详解(综合卷).docx
- 2024-2025学年结构工程师常考点试卷汇编附答案详解.docx
- 2024-2025学年结构工程师常考点试卷附完整答案详解【名校卷】.docx
- 2024-2025学年结构工程师常考点试卷有完整答案详解.docx
- 2024-2025学年结构工程师常考点试卷(突破训练)附答案详解.docx
- 2024-2025学年结构工程师常考点试卷附参考答案详解【A卷】.docx
- 2024-2025学年结构工程师常考点试卷带答案详解(达标题).docx
- 2024-2025学年结构工程师常考点试卷含答案详解(精练).docx
- 2024-2025学年结构工程师常考点试卷含答案详解(考试直接用).docx
文档评论(0)