- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Transportation Infrastructure Dar Al Handasah(交通基础设施Dar Al Handasah)
Transportation Infrastructure
Beirut Urban Transport Development Project
Country
Lebanon
Client
Council for Development and
Reconstruction, World Bank
Project Capital Cost
US$60 Million
Services
Design Review Construction Supervision
Main Trades
Transportation, Structural, Environmental
Project Time Frame
2005 – On Going
Narrative Description
With the ultimate goal of solving Beirut’s complex traffic congestion problems, the Urban
Transport Development Project includes, among other components, the construction of 16
grade separations (overpasses and underpasses) at the city’s highly congested
intersections. The project components include Reinforced and Post-Tensioned Concrete
Works, Earth Works, Sewage, Drainage, Water and Electrical Networks Pavement Works,
Sidewalks and Lighting, Signing and Marking, Street Amenities and Landscaping.
Dar Al Handasah Nazih Taleb Partners were retained by the Council for Development and
Reconstruction and the World Bank to provide design review, construction management
and supervision services including environmental and archeological monitoring and
mitigation for the main BUTD projects.
Transportation Infrastructure
Beirut Urban Transport Development Project
Dora Overpass - Reinforcement Works Scaffolds View Through Pipes
Dora Overpass – Formworks Works Hayek Overpass - Concrete Casting
Hayek Overpass - Concrete Casting Hayek Overpass – Completed Works
Dora Overpass – Formworks Works Dora Overpass – Formworks Works
Transportation Infrastructure
Beirut Urban Transport Development Project
Upgrading of Hayek Saloumeh Intersections
Country
Lebanon
Client
Council for Development and Reconstruction,
World Bank
Project Capital Cost
US$6.6 Million
Services
Design Review Construction Supervision
Main Trades
Transportation, Structural, Environmental
Project Time Frame
2005 – 2007
您可能关注的文档
- TRACTOR PARTS Modern USA(现代美国拖拉机零件).pdf
- Trade adjustment basics Meetup(贸易调整基本聚会).pdf
- Tractor Transmission analysis Tractor (拖拉机传动分析拖拉机).pdf
- Trade and Commodity Finance Credit Europe (欧洲贸易和大宗商品金融信贷).pdf
- Trade And Industrialisation After Globalisation’s (贸易和全球化的后工业化进程).pdf
- Trade Credit Insurance World Bank(世界银行的贸易信用保险).pdf
- Trade Finance Guide(贸易融资指南).pdf
- TRADE OF PLASTERING eCollege(抹eCollege贸易).pdf
- TRADE OF Industrial Insulation eCollege(工业绝缘eCollege的贸易).pdf
- Trade of Electrician eCollege(电工eCollege贸易).pdf
文档评论(0)