- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SPE 147623 Estimated Ultimate Recovery (EUR) (SPE 147623估计最终恢复(欧元))
SPE 147623
Estimated Ultimate Recovery (EUR) as a Function of Production Practices
in the Haynesville Shale
V. Okouma, F. Guillot, M. Sarfare, Shell Canada Energy, V. Sen, Taurus Reservoir Solutions Ltd.,
D. Ilk, DeGolyer and MacNaughton, T.A. Blasingame, Texas AM University
Copyright 2011, Society of Petroleum Engineers
This paper was prepared for presentation at the SPE Annual Technical Conference and Exhibition held in Denver, Colorado, USA, 30 October–2 November 2011.
This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been
reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its
officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to
reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright.
Abstract
Recent developments in well completion technologies have transformed the unconventional reservoir systems into
economically feasible reservoirs. However, the uncertainty associated with production forecasts and non-uniqueness related
with well/reservoir parameter estimation, are the main issues in future development of these reservoirs. In addition, recent
operational methods such as restricting rates by decreasing the choke size add up to the uncertainty in production forecasts.
This work attempts to investigate the effect of production practices on ultimate recovery. It is observed that wells producing
in the Haynesville
您可能关注的文档
- Solving Radical Equations ClassZone(解激进方程ClassZone).pdf
- Solving scratch problems and achieving long (解决划伤问题,实现长).pdf
- Solving spatial basic geometric constraint (基本解决空间几何约束).pdf
- SOLVING SUDOKU by Michael Mepham(由迈克尔梅珀姆解决数独).pdf
- Solving Systems of Equations by Graphing RPDP(解决系统的方程绘图RPDP).pdf
- Solving the Simple Harmonic Oscillator (解决简单谐振子).pdf
- Solving simultaneous equations using the (解联立方程使用).pdf
- Solving the incomplete markets model with (解决不完全市场模型).pdf
- Solving Trigonometry Problems 6.2 in Two and (6.2在两个和解决三角函数问题).pdf
- Solving the Challenges in Manufacturing and (在制造和解决的挑战).pdf
- SPE 111205 Fieldwide Reservoir Characterization (SPE 111205全油田储层特征).pdf
- SPE 141677 Use of Approximate Dynamic (SPE 141677使用近似的动态).pdf
- SPE 159262 Laboratory Testing and Numerical (SPE 159262例实验室测试和数值).pdf
- SPE Paper Number SPE133518PP (SPE纸SPE133518PP数量).pdf
- SPEAKER INSTALLATION GIUDE wireless (扬声器安装GIUDE无线).pdf
- SPEC 6829013433 SAE Grade 50 Synthetic Gear (规范6829013433 SAE 50级合成装备).pdf
- SPEC.PROCESS SPECIFICATION DEPARTURES (SPEC.PROCESS规范离职).pdf
- Specalog for 385C L Hydraulic Excavator, (Specalog 385 c L液压挖掘机,).pdf
- Specalog for 770 OffHighway Truck, AEHQ5723 (770年Specalog OffHighway卡车,AEHQ5723).pdf
- Specalog for 775D Quarry Truck AEHQ513902(为775 d采石场卡车AEHQ513902 Specalog).pdf
文档评论(0)