Mill upgrade ups higher value lumber (机升级ups更高价值的木材).pdfVIP

Mill upgrade ups higher value lumber (机升级ups更高价值的木材).pdf

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Mill upgrade ups higher value lumber (机升级ups更高价值的木材)

Mill upgrade ups higher value lumber production A $31 million upgrade at the Fort St. James, B.C. operation of Conifex is delivering more higher valued lumber products—and resulting in a smoother, more efficient product flow. By Jim Stirling Conifex Inc has taken another major step forward. Recent improvements at the company’s Fort St. James operation are resulting in the manufacture of more higher valued lumber products. Upgrading the lumber handling and finishing phases at the mill complex has also translated into a smoother, more efficient product flow. Conifex invested about $31 million in the projects at the mill, located in north central British Columbia. The projects have contributed to a significant two to three per cent drop in trim loss and a 12 to 15 per cent increase in the manufacture of prime J and Select grade lumber products. The phased projects began in the planer during the spring of 2010.The reason for the planer upgrade was to match or exceed the sawmill’s production while reducing trim loss and improving grade out turns, summarizes Roy Helmkay, Co- nifex’s vice president of operations, who is based in Fort St. James. Prior to the upgrade, Conifex had to make use of an auxiliary planer to keep pace with sawmill production. Now the planer and the sawmill both operate on a two shift daily basis, allowing the second planer to be decommissioned. Upgrades to the planning process are dominated by Comact equipment and were installed by DelTech, of Prince George, B.C. Highlighting the package is a Comact GradExpert automatic lumber grading system, which Helmkay credits with doing a very consistent job. “Much of the work we did in the planer was done to increase productivity and also create a smoother flow,” explains Helmkay. The process includes eradicating flow bottlenecks that can cause congestion and slowdowns. A new transfer deck and drop-out for culls was installed on the infeed to the planer. The addition of Mitsubishi

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档