- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程施工规范样本(Standard construction sample)
工程施工规范样本(Standard construction sample) Engineering construction standard sample The company will be in the construction of the project in strict accordance with the systems engineering technical specifications civil closed circuit monitoring TV GB51098 94 mandatory national standards, the system wiring do comply with the regulations of the state electrical installation engineering construction and acceptance norms and other national norms and regulations. The whole system equipment, power supply, signal channel according to the national standard of lightning protection, anti continuous lightning. All tubes must wear line pipe, tank protection, power supply line must be in charge of laying galvanized metal or flame retardant materials use norms and regulations promulgated by the state press tube and groove. 1. construction key points and difficulties and coping measures 1) due to the construction of a large amount of time is tight, need to cooperate with the construction unit, we appoint someone to track each unit construction schedule, construction fill in daily schedule, in close coordination with the construction units. 2) wiring system construction progress because of the need to cooperate with the decoration engineering, equipment installation and wiring work required a longer time interval, has laid line can be damaged, so the equipment must be installed on the line maintenance, re measurement. 3) due to a larger number of wiring cables, the cables are required to make a mark, the internal terminal box required to make marks to facilitate the maintenance of the bridge; vertical lashing solid, horizontal bridge cable cloth neatly. 4) by the cable weight per unit length is larger, the line length is longer, is placed with a correspondingly larger resistance, sheath, in order to avoid the core damage, is placed at the same time to more drag, not focus on both ends of the delivery. 5) branch line design of bridge laying, the indoor intercom point, line bridge a hol
您可能关注的文档
- 大体积混凝土裂缝分析及措施(Analysis and measures of cracks in mass concrete).doc
- 大学燃情搞笑版(The funny version of University).doc
- 大学物理实验红蓝绿光透过率实验数据(Experimental data of transmissivity of red, blue and green light in college physics experiment).doc
- 大学生人际交往心理(College students interpersonal psychology).doc
- 大学生人际交往障碍(College students, interpersonal communication disorder).doc
- 大型户外广告牌的制作安装工艺(Manufacture and installation process of large outdoor billboard).doc
- 大学生动画实习日记整理好(Animation practice diary of College Students).doc
- 大学生厌学原因的调查与分析(Investigation and analysis of reasons for university students' Weariness).doc
- 大学生喜欢追求名牌)(College students like to pursue famous brands).doc
- 大学生如何写 简历(How do college students write resumes).doc
- 工程机械底盘设计备用考试题(Standby test for construction machinery chassis design).doc
- 工程机械故障特点分析及其诊断技巧(Analysis of fault characteristics of construction machinery and its diagnostic skills).doc
- 工程机械柴油机故障诊断技术(Fault diagnosis technology for diesel engine of construction machinery).doc
- 工程机械故障特点分析及经验诊断(Fault analysis and experience diagnosis of construction machinery).doc
- 工程机械的故障特点分析及故障诊断技巧(Fault characteristics analysis and fault diagnosis skills of construction machinery).doc
- 工程承包参考文献(Reference document of engineering contract).doc
- 工程机械十二五规划(12th Five-Year planning of construction machinery).doc
- 工程概预算与招投标第二阶段在线作业(Second stage online operation of project budget and bidding).doc
- 工程测量员-gps外业作业流程(Engineering surveyor -gps external operation process).doc
- 工程热力学复习题(Engineering thermodynamics review).doc
文档评论(0)