工程施工规范样本(Standard construction sample).docVIP

工程施工规范样本(Standard construction sample).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程施工规范样本(Standard construction sample)

工程施工规范样本(Standard construction sample) Engineering construction standard sample The company will be in the construction of the project in strict accordance with the systems engineering technical specifications civil closed circuit monitoring TV GB51098 94 mandatory national standards, the system wiring do comply with the regulations of the state electrical installation engineering construction and acceptance norms and other national norms and regulations. The whole system equipment, power supply, signal channel according to the national standard of lightning protection, anti continuous lightning. All tubes must wear line pipe, tank protection, power supply line must be in charge of laying galvanized metal or flame retardant materials use norms and regulations promulgated by the state press tube and groove. 1. construction key points and difficulties and coping measures 1) due to the construction of a large amount of time is tight, need to cooperate with the construction unit, we appoint someone to track each unit construction schedule, construction fill in daily schedule, in close coordination with the construction units. 2) wiring system construction progress because of the need to cooperate with the decoration engineering, equipment installation and wiring work required a longer time interval, has laid line can be damaged, so the equipment must be installed on the line maintenance, re measurement. 3) due to a larger number of wiring cables, the cables are required to make a mark, the internal terminal box required to make marks to facilitate the maintenance of the bridge; vertical lashing solid, horizontal bridge cable cloth neatly. 4) by the cable weight per unit length is larger, the line length is longer, is placed with a correspondingly larger resistance, sheath, in order to avoid the core damage, is placed at the same time to more drag, not focus on both ends of the delivery. 5) branch line design of bridge laying, the indoor intercom point, line bridge a hol

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档