大工12秋《路基路面工程》在线作业1(第5次)(Great works 12 autumn subgrade and pavement engineering online homework 1 (fifth times)).docVIP

大工12秋《路基路面工程》在线作业1(第5次)(Great works 12 autumn subgrade and pavement engineering online homework 1 (fifth times)).doc

  1. 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工12秋《路基路面工程》在线作业1(第5次)(Great works 12 autumn subgrade and pavement engineering online homework 1 (fifth times))

大工12秋《路基路面工程》在线作业1(第5次)(Great works 12 autumn subgrade and pavement engineering online homework 1 (fifth times)) In the fall of 12 road engineering online homework 1 A RadioButtonList The main function of asphalt pavement is (1.). A. directly under the wheel load B. antifreeze, anti wet C. main bearing D., water drainage Answer: C 2. in the surface layer of asphalt poured asphalt layer is (). A. need to add the old asphalt pavement wearing surface The old asphalt pavement cracks B. C. need to add new asphalt pavement wearing surface D. to the old asphalt pavement asphalt overlay Answer: D 3. the following test project belongs to the project and the measured rock subgrade, does not belong to the earth roadbed project measured is (). A. compactness The smoothness of the slope B. C. deflection D. smoothness Answer: B The following 4. packing, according to the relevant provisions after treatment can be used for embankment filling is lower (packing). A. permafrost B. powder soil C. organic soil D. garbage Answer: B 5. for excavation engineering, machinery and equipment selection of the best combination is (). A. excavators, bulldozers, mobile air compressors, rock drilling machine B. bulldozer, excavator, loader, crusher and machine C. bulldozers, scrapers, excavators, loaders and dump trucks D. bulldozer, scraper, kneading, roller, sprinkler, grader and truck Answer: D 6. in the earthwork embankment construction, ground slope is greater than () of the lot, the construction method of vertical stratification, along the longitudinal slope layer, compacting fill layer. A. 5% B. 10% C. 12% D. 14% Answer: C 7. a roadbed replacement construction, the replacement depth is 2m, groundwater is 1.8~2.0m below the ground, the following non permeable aquifer. In order to reduce and intercept groundwater, in replacement should be set at the boundary (). A. well B. chute C. evaporation pool D. stone ditch Answer: D Asphalt mixture structure 8. by continuous open graded aggregate compos

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档